GÜDE 94198 Скачать руководство пользователя страница 31

The pum p shall never be installed in m oist shifts 
(danger of shortcut, dam age caused by corrosion)!

 

For  avoiding  or prevention of possible  damage (as e.g. 
flooding the room s etc.) due to   faulty pum p operation 
(e.g. due failure or defects) the owner (user)  shall take 
reasonable safety m easures (installation of alarm  
equipm ent, a spare pum p etc.) 

In case of failure on the pump,. the repair shall be 
performed exclusively by an authorized service 
repairshop.Only original spare parts may be used. 

We  have to  draw  your attention to the fact that 
according to  the valid  standards w e cannot take 
responsibility for below m entioned cases of possible 
dam age caused by our devices: 

Unproper repairs performed by unauthorized service repair 
shops;  

Using pump for a different purpose or failing to observe its 
use according to the provisions; 

Overloading of the pump by long-term operation; 

 

Operation 

 

Air pressure 

Pull  out the netw ork plug. 
Open the consumption valve, e.g. w ater main tap, so that the 
w ater may be  pressed out  of the  system.. 

 

Turn the protection lid  on the bleeding  valve in the dow n 
direction (F).  
Check  the air pressure in the vessel w ith compressor and 
device for tyre pumping. 
The specified air pressure is 1,5 ± 0,3 bar.

 

 

Bleeding 

Release the bleeding screw  and let the possible closed air 
escape. 

(Fig.  A; pos. 2) 

 
Water Bubbles 

Release  the screw  for draining w ater bubbles so that the 
pump may be drained (Fig. A; pos.11) 

 

Vessel pressure 

Sw itch off pressure set by the  manufacturer is 3-4 bar after 
completion  of filling. 
Setting  pressure of the vessel (air) makes  1,5 ±  0,3 bar and it 
should be regularly checked and modified (G). 

 
Safety Instruction for Operator 

Use the device only after you have carefully read Operating 
Manual. 
Observe all safety instructions mentioned  in the Manual. 
Behave responsibly against other persons 

 

Instruction Step-by-Step 

 

 

Connect the suction pipeline that com plies with the 
outlet   connecting pipe to the check valve  (D) (foot 
valve).  Tighten  all threading connections by sealing 
band (B) 

 

After filling up rem ove the bleeding screw on the 
back side of the pum p and on  the connecting line of 
pressure pipeline. (Fig. A;  pos. 1 and 2) Fill  the 
device up until  the w ater exits from the bleeding 
hole (E)   

 

Make tight the   bleeding screw and retight it again. 
Then m ake tight the pressure pipeline and connect 
it.  

 

Connect the pum p to the electric network. 

    Caution:  When installing suction and  pressure 

pipeline   on corresponding connection lines, the 
corresponding thread shall alw ays be tightened 
carefully so that no  dam age occurs due to cracking of 
the pum p shell (A) ! 

 

    Caution:  Careful sealing of thread connections  

(A/B) and airless filling (E) of  suction system – (suction 
hose and pum p shell) , w ill save you from  trying to 
perform suction that m ay often be unsuccessful!  
Check the tightness of the foot valve (D) – Fill the 
system according to the instruction (C) and pull  the 
suction hose out of the m edium being repumped before 
putting into operation for the purpose of checking   (D) -  
the liquid should not escape from  the suction hose 
now ! 

 
 

 

 
 

 
 

 
 

 
 

 

 
 

 
 

 
 

 
 

 

 
 

 
 

 
 

 
 

 

 
 

 
 

 
 

 
 

 

 
 

 
 

 

Im portant: Should the pum p be out of operation for a longer period of tim e, the pipeline and the pum p shell m ust be 
unconditionally em ptied.    

 

Troubleshooting 

31

Содержание 94198

Страница 1: ...JA 200 T 400 V Copyright G de GmbH Co KG Birkichstrasse 6 74549 Wolpertshausen Germany 94198 Deutsch 3 Magyar 8 e tina 13 Sloven ina 18 Nederlands 23 English 28 Fran ais 33 Italiano 38...

Страница 2: ...B A 1 C D 4 3 2 7 6 8 5 2...

Страница 3: ...schutz Abfall nicht in dieUmwelt sondern fachgerecht entsorgen Verpackungsmaterial aus Pappe kann an den daf r vorgesehen Recycling Stellen abgegeben werden Schadhafte und oder zu entsorgende elektris...

Страница 4: ...und der elektrische Stecker vor dem Gebrauch in Ordnung sind Die Pumpe auf einer flachen stabilen und w aagrechten Ebene aufstellen Vor Durchf hrung irgendw elcher Arbeiten an der Pumpe den Stecker a...

Страница 5: ...e Beschreibung der einzelnen Bedeutungen finden Sie im Kapitel Kennzeichnung Entsorgung der Transportverpackung Die Verpackung sch tzt das Ger t vor Transportsch den Die Verpackungsmaterialien sind in...

Страница 6: ...gte Servicestelle zu erfolgen Es d rfen nur Originalersatzteile verw endet w erden Wir machen Sie darauf aufmerksam dass wir gem den g ltigen Normen bez glich eventueller von unseren Ger tenverursacht...

Страница 7: ...Verschlei teile ersetzen Thermoschalter schaltet die Pumpe ab Der Thermo berlastschutz hat die Pumpe w eil sie berhitzt ist ausgeschaltet Kein Strom Schmutzpartikel z B Kieselsteine haben sich in der...

Страница 8: ...i szakszer en kell megsemmis teni A karton csomagol st t lehet adni megsemm s t sre hullad kgy jt be Hib s s vagy t nkrement villany vagy elektromosg peket t kell adni az illet kes hullad kgy jt telep...

Страница 9: ...kemberek v gezhetik Kiz r lag eredeti alkatr szeket szabad haszn lni Meg kell akad lyozni hogy a g p a gyerekek keze gy ben legyen zemeltet s el tt ki kell pr b lni hogy hely k n vannak e a sz ks ges...

Страница 10: ...mellet szakk pzetts g elsaj t t sa rdek ben K pz s A g p haszn lat hoz elegend szakember felvil gos t sa resp a haszn lati utas t ssal val megismerked s Speci lis k pz s nem sz ks ges M szaki adatok J...

Страница 11: ...zel s L gnyom s Kapcsolja ki a g pet az ramk rb l Nyissa ki a fogyaszt szelep t pl v zcsapot hogy a rendszerben l v v z ki legyen nyomva Ford tsa a l gtelen t szelep v d fedel t lefel mutat ir nyban F...

Страница 12: ...er lni az elkopott alkatr szeket A h kapcsol kikapcsolja a szivatty t A szivatty t kikapcsolta a h elleni v delem ugyanis t l van hev lve Nincs ram A szennyez d s pl kavics le lepedett a sz v ny l sba...

Страница 13: ...p t m Varov n p ed automtick m rozb hem P kazy P e st si n vod k obsluze Ochrana ivotn ho prost ed Odpad neodkl dat do okoln ho prost ed n br odborn likvidovat Obalov materi l z lepenky lze odevzdat v...

Страница 14: ...Pokud je erpadlo vadn je nutno opravu prov st v hradn v opravn ch kter jsou k tomu zplnomocn n Sm b t pou ity pouze origin ln n hradn sou sti Vhodn mi opat en mi je nutno zabr nit tomu aby byl p stroj...

Страница 15: ...z cvik odborn znalou osobou pop z cvik dle n vodu k pou it Speci ln kolen nen nutn Technick daje JA 200 T 400 V P pojka 400 V 50 Hz V kon motoru P1 2000 W P1 Max sac v ka 9 m Max erpan mno stv 5000 l...

Страница 16: ...dborn znalosti P i eventueln ch poruch ch se mus te v dy obracet na z kaznick servis Zajist te bezpodm ne n dobr p vod vzduchu aby se p ede lo p eh t erpadla erpadlo neinstalovat do p li t sn ch achet...

Страница 17: ...tepeln mu p et en erpadlo vypnula proto e je p eh t Chyb elektrick proud stice ne istot nap obl zky se usadily v sac m otvoru P stroj nechat vychladnout erpadlo demontovat a vy istit zabr nit nas v n...

Страница 18: ...rozbehom Pr kazy Pre ta si n vod na obsluhu Ochrana ivotn ho prostredia Odpad neodklada do okolit ho prostredia ale odbornelikvidova Obalov materi l z lepenky je mo n odovzda v recykla n ch zariadenia...

Страница 19: ...sti Ak je erpadlo chybn je nutn opravu vykona v hradne v opravovniach ktor s na to splnomocnen Sm by pou it iba origin lne n hradn s asti Vhodn mi opatreniami je nutn zabr ni tomu aby bol pr stroj v d...

Страница 20: ...odborne znalou osobou pr p z cvik pod a n vodu na pou itie peci lne kolenie nie je nutn Technick daje JA 200 T 400 V Pr pojka 400 V 50 Hz V kon motora P1 2000 W P1 Max nas vacia v ka 9 m Max erpan mno...

Страница 21: ...s te v dy obraca na z kazn cky servis Zaistite bezpodmiene ne dobr pr vod vzduchu aby sa predi lo prehriatiu erpadla erpadlo nein talujte do pr li tesn ch achiet ani ho nezakr vajte Obsluha Tlak vzduc...

Страница 22: ...o Ochrana proti tepeln mu pre a eniu erpadlo vypla preto e je prehriate Ch ba elektrick pr d astice ne ist t napr okruhliaky sa usadili v nas vacom otvore Pr stroj necha vychladn erpadlo demontova a v...

Страница 23: ...laatsen afleveren Beschadigde en of verwijderde elektrische of elektronische apparaten bij de daarvoor bestemde recyclingplaatsen afleveren Verpakking Tegen vocht beschermen Verpakkingsori ntering bov...

Страница 24: ...bied Indien de pomp defect is dient de reparatie uitsluitend door bevoegde w erkplaatsen uitgevoerd te w orden Slechts originele onderdelen mogen gebruikt w orden De toegang van kinderen moet door jui...

Страница 25: ...ooppersoneel is er geen speciale kw alificatie voor het gebruik van het apparaat nodig Minimale leeftijd Het apparaat mag slechts door personen gebruikt w orden van 16 jaar of ouder Uitzondering hiero...

Страница 26: ...automatisch w eer in Als de motorschakelaar w eer is ingeschakeld is het beslist noodzakelijk de oorzaak van het uitschakelen op te sporen en deze oorzaak te verw ijderen zie ook Storingen De hier uit...

Страница 27: ...omdat deze oververhit is uitgeschakeld Geen stroom Vuildeeltjes bijv kiezelstenen hebben zich in de aanzuigopening vastgezet Apparaat laten afkoelen Pomp demonteren en reinigen aanzuigen van vreemde v...

Страница 28: ...ngenvironment have it disposed by professionals Cardboard packingmaterial can be delivered to recycling establishments reserved for disposal thereof Faulty electric or electronic devices and or those...

Страница 29: ...sary to find out by a professional test if all required electric protection measures are available During operation of home w ater station nobody may stay in the medium being repumped Prevent the home...

Страница 30: ...C LWA 68 dB A 1m Weight approx 25 kg Assortment position No 94198 Transport and Storing When storing in winter make sure that no water is in the device otherwise the device may be destroyeddue to fre...

Страница 31: ...mpletion of filling Setting pressure of the vessel air makes 1 5 0 3 bar and it should be regularly checked and modified G Safety Instruction for Operator Use the device only after you have carefully...

Страница 32: ...ng protection Electric pow er missing Impurity particles e g pebbles have settled dow n in the suction hole Let the device getting cool Disassamble and clean the pump prevent suction of foreign substa...

Страница 33: ...marrage automatique Consignes Lire le mode d emploi avant l utilisation Protection de l environnement Liquidez lesd chetsde mani re ne pas nuire l environnement D posez l emballageen carton au d p t...

Страница 34: ...appareil si les dispositifs de s curit sont us s ou endommag s Ne mettez jamais les dispositifs de s curit hors service Utilisez l appareil uniquement des fins indiqu es dans ce mode d emploi Vous te...

Страница 35: ...de l emballage dans le circuit de mati res permet d conomiser des mati res premi res et de r duire les d chets Des parties de l emballage telles que films styropore peuvent tre dangereux pour les enfa...

Страница 36: ...moteur coupe automatiquement la pompe La dur e de refroidissement s l ve environ 25 minutes pass ce d lai la pompe se remet automatiquement en marche Si l interrupteur du moteur s enclenche il est n...

Страница 37: ...lespi cesus e L interrupteur thermique coupe la pompe La protectioncontre lasurchargethermiquea coup la pompe pour cause de surchauffe Manquede courant lectrique D p t de particulesd impuret s caillou...

Страница 38: ...mento automatico Direttive Prima dell uso leggere il Manuale d Uso Tutela dell ambiente Smaltire i rifiuti in modo professionale che non sia inquinato l ambiente Il materiale d imballo di cartone pu e...

Страница 39: ...hio Non utilizzare l apparecchio nel caso dei dispositivi di sicurezza danneggiati e o usurati Mai disattivare i dispositivi di sicurezza Utilizzare l apparecchio esclusivamente per lo scopo indicato...

Страница 40: ...bambini Esiste il pericolo di soffocamento Tenere le parti dell imballo fuoriportata dei bambini e smaltirli prima possibile Requisiti all operatore L operatore obbligato prima di usare l apparecchio...

Страница 41: ...ispensabile trovare e rimuovere la causa vedi Ricerca del guasto I dati qui riportati non devono essere considerati delle procedure per le riparazioni fatte a casa perch i lavori di riparazione richie...

Страница 42: ...Pulire la pompa e sostituire le parti usurate Termico spegne la pompa Il termico ha spento la pompa per surriscaldo Manca la corrente elettrica Le particelle d impurit ad es pietrine sono depositate...

Страница 43: ...ali delle direttive CE sulla sicurezza ed igiene Nel caso della modifica dell apparecchio da noi non autorizzata la presente dichiarazione perde la propria validit AZONOSS GI NYILATKOZAT EU Ezzel kije...

Страница 44: ...ni standardi Wykorzystane zharmonizowane normy Kullan lan uyum normlar EN 60335 2 41 A2 2010 EN 60335 1 A14 2010 EN 62233 2008 EN 55014 1 A1 2009 EN 55014 2 A2 2008 EN 61000 3 2 A2 2009 EN 61000 3 3 2...

Страница 45: ......

Страница 46: ......

Страница 47: ......

Страница 48: ...G DE GmbH Co KG Birkichstrasse 6 74549 Wolpertshausen Deutschland Tel 49 0 7904 700 0 Fax 49 0 7904 700 250 eMail info guede com...

Отзывы: