background image

18

Closed Position 
Stop Plates

Gate Hinge

CONTROL BOX

Gate Hinge

The gate leaf can open
up to 110˚ (max.)

Optional Ground Stop

(beneath gate)

The gate leaf can open
up to 110˚ (max.)

MASTER GATE

SLAVE GATE

Installation of the Closed Position Stops

The GTO/PRO® 4000/4200 Gate Operators firmly hold the gates in the closed position using
positive stops. The positive stops help stabilize the gate leaves in the closed position.  To further
enhance stability and security, we strongly recommended using an optional GTO/PRO®
Automatic Gate Lock
 (see Accessory Catalog) with your dual gates.

IMPORTANT: 

You need to

determine which side of the
driveway you will mount the
control box. From this point on
the gate and gate operator on the
same side as the control box will
be referred to as the MASTER
gate and gate operator. The gate
and gate operator on the opposite
side of the driveway from the
control box will be referred to as
the SLAVE  gate and gate
operator.

Illustration A

Closed Position Stop Plate mounted 
horizontally on metal post with U-bolts.

SLAVE Gate Frame

MASTER Gate Frame

TOP VIEW

FRONT VIEW

Step 1

Detach the gate operators from the gates and move the
gates to their closed position (Illustration A).  Using
appropriate hardware for your type of gate (U-bolts for
tube or chain link; screw or bolts for wood or metal)
attach the closed position stop plate (horizontally) about
mid height on the MASTER gate frame. Do not tighten it
completely at this time.  Slide the stop plate toward the
frame of the SLAVE gate leaf until they touch
(Illustration B).  Once you have moved the stop plate to
the correct position, tighten its hardware completely.

NOTE:

 The optional ground stop post is used to provide a secure point for the SLAVE gate to close

against. If you will be using the GTO/PRO Horizontal Gate Lock accessory with your gate operator
system, the closed position ground stop is REQUIRED, as shown in Steps 2 and 3 on the next page.

Illustration B

Содержание /PRO SW-4000

Страница 1: ...eleasing GTO Inc from any and all liability If you are not in agreement with this disclaimer or do not feel capable of properly following all installation and safety instructions you may return this p...

Страница 2: ...access locations not servicing the general public in which unauthorized access is prevented via supervision by security personnel The GTO PRO 4000 Series Gate Operators are intended for use with vehi...

Страница 3: ...Bracket page 16 Mounting the Operator page 17 Installation of the Closed Position Stop page 18 Mounting the Control Box page 19 Connecting the Operator Power Cable page 20 Installing the Battery page...

Страница 4: ...other access control products These optional accessories see the Accessory Catalog are available The GTO PRO 4000 4200 Operators feature adjustable obstruction sensing This safety feature makes the ga...

Страница 5: ...ns and warnings in this manual are identified with this warning symbol The symbol identifies conditions that can result in damage to the operator or its components serious injury or death Because GTO...

Страница 6: ...d size of gate its frequency of use and the proper class rating 2 Make sure the gate has been properly installed and swings freely in both directions Repair or replace all worn or damaged gate hardwar...

Страница 7: ...d 3 Devices such as contact sensors safety edges and non contact sensors photo beams provide additional protection against entrapment 4 If push buttons or key switches are installed they should be wit...

Страница 8: ...ay to it at least once per month 7 Service the gate and gate operator regularly Grease hinges spray push pull tube with high quality silicon spray and replace the battery every 3 5 years 8 To operate...

Страница 9: ...Type A an inherent i e built in entrapment sensing system as the primary type of entrapment protection Also the GTO PRO 4000 4200 has provisions for the connection of Type B2 protection to be used as...

Страница 10: ...operation and are required when installing the GTO PRO 4000 4200 Automatic Gate Operators Furthermore a walk through gate must be installed if pedestrian traffic is expected near the vehicular gate W...

Страница 11: ...ida USA Disconnect operator ONLY when the control box power switch is OFF and the gate is NOT moving L I S T E D US C Product identification and manual operation instruction label 1 installed on contr...

Страница 12: ...3 3 8 x 3 16 Bushing 2 3 8 x 3 4 Bushing 2 1 2 Lock Nut 4 3 18 Lock Nut 2 Hardware Gate Bracket 1 Post Pivot Bracket 1 Customer Support Card Post Bracket 1 Closed Position Stop Plate 1 2 Receiver Moun...

Страница 13: ...power cable Hairpin Clip 2 3 8 x 3 1 2 Clevis Pin 1 1 2 x 2 3 4 Bolt 2 3 8 x 3 3 4 Bolt 2 1 2 x 10 Carriage Bolt 2 8 Nylon Cable Tie 10 1 2 Washer 4 3 8 Washer 3 3 8 x 3 16 Bushing 2 3 8 x 3 4 Bushin...

Страница 14: ...x See page 22 Powering the System and the Accessory Catalog for wire and solar charging panels If the gate is more than 1000 away from an AC power source you will need to use at least one GTO Solar Pa...

Страница 15: ...ode GTO remote mounted RF receiver tuned to 318 MHz Operator length with push pull tube fully retracted is 461 4 mounting point to mounting point Adjustable auto close timer 15 to 120 s and obstructio...

Страница 16: ...e of a pull to open installation on a chain link fence and single gate Mounting the operators on a masonry columns require special procedures see Column Installation Information on page 38 if you inte...

Страница 17: ...han those supplied On wood posts use a metal plate not provided between the nuts and post to prevent the operator from pulling the bolts and washers through the wood On masonry columns use red heads o...

Страница 18: ...holes in fence post as marked using a 1 2 drill bit Install the post bracket using the 1 2 x 10 carriage bolts 1 2 washers and lock nuts provided Step 2 Position the post bracket on the fence post wi...

Страница 19: ...ear mount bushing and post pivot brackets and secure with the clevis pin and hair pin clip Step 6 Place a small bushing under the the front mount and attach the gate bracket to the front mount using t...

Страница 20: ...n t have 2 inches of clearance or the gate operator is binding on the post pivot bracket remove the bolt in the post bracket and readjust the pivot bracket until you can achieve the proper clearance W...

Страница 21: ...e post bracket assembly if necessary Level Operator Fence Post Clevis Pin Bushing and Hairpin Clip Mounting the Operator You will need to install the GTO PRO 4200 SLAVE operator arm on the second gate...

Страница 22: ...from the control box will be referred to as the SLAVE gate and gate operator Illustration A Closed Position Stop Plate mounted horizontally on metal post with U bolts SLAVE Gate Frame MASTER Gate Fram...

Страница 23: ...y NOTE For a push to open installation gate opens out from the property attach the closed position stop plate to the outside of the gate Step 2 Install a low profile ground stop not provided beneath t...

Страница 24: ...t Hub Lock Nut Strain Relief NOTE The battery that came with your GTO PRO 4000 4200 MUST be placed in the top horizontal battery slot with the terminals on the RIGHT The extra vertical battery slot is...

Страница 25: ...t the stripped wires of the power cable into the appropriate terminals on the SLAVE OPERATOR terminal block The green wire should be inserted into the GRN terminal the blue wire into BLU the orange wi...

Страница 26: ...sure the distance from this outlet to the control box following the path where the wire will be laid After you have measured how much wire is needed cut the wire to the appropriate length Not more tha...

Страница 27: ...5 Strip 3 16 off the ends of the low voltage wire and twist tightly Attach these ends to the 18VAC terminals located on the POWER IN terminal block see illustration at right Be certain not to let the...

Страница 28: ...strongly recommended Step 6 Strip 1 2 of insulation from the ends of the low voltage wire Attach these stripped ends to the transformer terminals A dab of household petroleum jelly on each terminal w...

Страница 29: ...e Switching this to OFF only disables the open and close warning not the obstruction warning DIP Switch 3 Auto Close With the Auto Close switch in the OFF position the gate will remain open until it r...

Страница 30: ...en simultaneously SLAVE gate starts to close 8 seconds before MASTER gate 1 ON 2 3 4 DUAL MODES ON OFF 1 2 3 4 1 ON 2 3 4 DUAL MODES ON OFF 1 2 3 4 1 OFF 2 OFF 1 ON 2 OFF and 3 OFF 1 ON 2 OFF and 3 ON...

Страница 31: ...conds Step 4 Press the transmitter button and allow the gates to return to the fully open position YOUR FIRST GATE S CLOSED POSITION LIMIT IS NOW PROGRAMMED Step 5 Activate your operators again by pre...

Страница 32: ...sition BOTH YOUR MASTER AND SLAVE GATE S CLOSED POSITION LIMITS ARE NOW PROGRAMMED TESTING YOUR CLOSED LIMIT SETTING Press your entry transmitter and allow your gates to close If CLOSED positions are...

Страница 33: ...this equipment Such modifications could void the user s authority to operate the equipment Obstruction Sensitivity Potentiometer ALWAYS KEEP SAFETYAT THE TOP OF YOUR LIST WHEN ADJUSTING OR SERVICING...

Страница 34: ...fety device wiring to the terminal blocks Unplugging the transformer does not turn power to the operator OFF Contact Sensor Input Connection Connect one of the OPEN EDGE contact sensor wires to the CO...

Страница 35: ...PLEASE NOTE Non contact sensors are not included with the GTO PRO 4000 Wire from Non Contact Sensor photo beam STALL FORCE M I N M A X GRN BLK RED RECEIVER COM COM CYCLE CLOSE SAFETY EXIT OPEN SHADOW...

Страница 36: ...to the COMMON COM terminal and the other to the CYCLE CLOSE terminal on the GTO PRO 4000 control board Each activation of the accessory will cause the gate to cycle as follows OPEN STOP CLOSE STOP If...

Страница 37: ...position for the post pivot bracket insert the 5 16 x 1 3 4 bolt through the aligned holes of the post bracket and post pivot bracket and fasten it with the 5 16 washer and nut IMPORTANT If you loosen...

Страница 38: ...er switch ON The control board is now configured to push the gate open Setting the Open Position Limit Step 1 Confirm that the power switch is in the ON position and the gate is in the CLOSED POSITION...

Страница 39: ...will need to CLEAR your OPEN LIMIT settings and follow steps one 1 to four 4 again CLEARING PROGRAMMED OPEN LIMIT SETTING If you make a mistake and set the limit at the wrong position press your tran...

Страница 40: ...or broken or spliced wires Check the Red STATUS LED on the Control Board IF THE LED IS ON but the unit is not working 1 Check the battery in your transmitter and replace with a fresh one if needed 2 V...

Страница 41: ...easure voltage at panel and control box 12 V Battery ________________________________12 0 to 13 5 Vdc 7 0 Ah Charging circuit _____________________________12 0 to 14 8 Vdc measure voltage with battery...

Страница 42: ...rization RGA number to you 4 Securely pack the component s authorized for return to the factory Write the RGA number issued to you on the outside of the package in LARGE BOLD PRINT Ship the package s...

Страница 43: ...t toward the column It is recommended that you place a steel plate between the operator mounting brackets and masonry surface for additional strength B If a push to open installation is impossible due...

Страница 44: ...er is a miniature version of the GTO PRO 4000 4200 entry transmitter and has the same adjustable code settings 12 Volt battery included Entry Transmitter RB741 The GTO PRO entry transmitter with adjus...

Страница 45: ...Door Receiver 9 Volt battery included Replacement Battery RB500 Standard 12 volt 7 0 amp hour maintenance free battery for the GTO PRO 2000 GTO PRO 3000 3200 GTO PRO 4000 4200 gate operator systems Th...

Отзывы: