17
Step 10
Attach the operator to the securely bolted post bracket assembly and gate bracket using clevis pins, bushings, and hairpin
clips, or optional Pin Locks (see Accessory Catalog). Verify that the operator is level and adjust the post bracket assembly if
necessary.
Level Operator
Fence Post
Clevis Pin, Bushing, and Hairpin Clip
Mounting the Operator
You will need to install the GTO/PRO 4200 SLAVE operator
arm on the second gate following the same steps you did to
install the GTO/PRO 4000 MASTER operator arm. Begining on
page 13, Step 1 through page 17, Step 10. When the second
gate operator is installed go to the page 18 and continue.
DUAL GATE INSTALLATION