16
Step 9:
Move the operator away from the gate bracket. The mounting holes should be centered over the scribe line. Mark the gate in
the center of the gate bracket holes. Remove the gate bracket and drill the
1
/
2
" holes in the gate cross member and attach the
gate bracket using the
1
/
2
" x 2
3
/
4
" bolts, washers and nuts.
Step 8:
Remove the clevis pin from
the front mount and while
supporting the gate operator,
swing the gate and gate
operator to the closed position.
With the gate and gate
operator in the closed position
check the clearance and be
sure that the gate operator is
not binding at the post pivot
bracket.
If you don't have 2 inches of clearance or the gate operator is binding on the post pivot bracket, remove the bolt in
the post bracket and readjust the pivot bracket until you can achieve the proper clearance.
With the post pivot bracket in the optimum position for clearance and freedom of movement, replace the bolt in a
post bracket adjustment hole and return the operator to the open position and recheck the gate operator level and
clearance. Make sure the gate bracket is clamped securely.
Gate in the
CLOSED POSITION
Pinch Area
2" minimum
LEVEL horizontal cross member
Mark cross member through middle of
gate bracket slots and drill 1/2" holes
Round Tube & Chain Link Gate
Square Tube Gate
Mounting Plate Created
for Decorative Gate
(required but not supplied)
FRONT VIEW
SIDE VIEW
FRONT VIEW
SIDE VIEW
Installing the Gate Bracket