34
Step 3
With the gate in the fully closed position and the operator retracted, swing the operator to the gate. Mark reference points
for bolt holes on gate cross member through middle of gate bracket slots. The operator must be level. Drill
3
/
8
" holes into the
gate cross member as marked. Fasten gate bracket to cross member using (2) 3/8" x 3" bolts, washers, lock washers, and
nuts. Attach the operator to the post bracket assembly and gate bracket using clevis pins, bushings, and hairpins clips.
Step 4
Make sure the control box power switch is OFF. Use a small
screwdriver to move the Number 4 DIP switch from the factory
setting (OFF / Pull-To-Open) to ON for Push-To-Open. Turn
power switch ON. The control board is now configured to push
the gate open.
Setting the Open Position Limit
Step 1
Confirm that the power switch is in the ON position, and the gate is in the CLOSED POSITION.
Step 2
Activate your operator by pressing the entry transmitter button. Your gate should now be moving from the closed position
toward the open position. Prepare to STOP gate by pressing the entry transmitter button again when the gate reaches the
desired open position. This step may be repeated until desired close position is achieved. Once the desired OPEN position has
been achieved, proceed to Step 3.
1
ON
2
3
4
5
6
7
ON
OFF
1 2 3 4 5 6 7
DIP#4
ON
Push-to-open operation.
OFF
Pull-to-open operation (factory setting).
GRN
BLK
RED
RECEIVER
COM
COM
CYCLE
CLOSE
SAFETY
EXIT
OPEN
SHADOW
LOOP
CLOSE
EDGE
OPEN
EDGE
Level Operator
Fence Post
Clevis Pin, Bushing, and Hairpin Clip