
4. Assemble the two wall attachment brackets (14) to the sidewall attachment gussets (10) using
flange bolts (2) and flange nuts (3).
NOTE:
• Align the top hole of the sidewall attachment gusset (10) to the hole next to the square
in the wall attachment bracket (14) to position the platform assembly above the eave.
• Hand tighten the flange bolts (2) between the sidewall attachment gussets (10) and
wall attachment brackets (14) to aid in leveling the platform assembly.
Figure 5-9
Assembling the wall attachment brackets to the sidewall attachment gussets (second platform section)
2
5/16 x 3/4 in. flange bolt (S-6606)
10
Sidewall attachment gusset (WBS-0018)
3
5/16 in. flange nut (S-3611)
14
Wall attachment bracket (WBS-0010)
54
PNEG-2077
TopDry – Platforms and Bin Stairs