
2. Assemble the platform end toe board (8) and the inside kick plate (23) to end of platform floor pan
(7) and the outside support angle (6) using flange bolts (2) and flange nuts (3).
NOTE:
Tighten the flange bolts (2) before the platform is installed to the bin.
Figure 5-7
Assembling the platform end toe board and inside kick plate (second platform section)
2
5/16 x 3/4 in. flange bolt (S-6606)
7
Platform floor pan (WBS-0011)
3
5/16 in. flange nut (S-3611)
8
Platform end toe board (WBS-0022)
6
Outside support angle (WBS-0015)
23
Inside kick plate (WBS-0014)
52
PNEG-2077
TopDry – Platforms and Bin Stairs