Chapter 2: Intermediate Platform
Installing the Handrails for Intermediate Platform
The following procedure is for the installation of handrails for the intermediate platform located below the
access door.
1. Install the handrail brackets (17) to the top end of the handrail posts (9) with flange bolts (2) and
flange nuts (3).
NOTE:
Install the flange bolts (2) from the inside of the platform and flange nuts (3) on the outside.
2. Install the intermediate platform upper handrail (81) to the handrail brackets (17) using two self-drill-
ing screws (4) per bracket in the platform sections.
NOTE:
Install the self-drilling screw (4) from the outside of the handrail bracket (17).
3. Align the intermediate platform lower handrail (82) with the hole located in the middle of the handrail
posts (9) and secure using self-drilling screws (4) in the platform sections.
NOTE:
Install the self-drilling screw (4) from the outside of the handrail post (9).
Figure 2-19
Installing the handrails
2
5/16 x 3/4 in. flange bolt (S-6606)
17
Handrail bracket (WBS-0319)
3
5/16 in. flange nut (S-3611)
81
Upper handrail (TDWBS-0039)
4
1/4 x 1 in. self-drilling screw (S-7229)
82
Lower handrail (TDWBS-0038)
9
Platform handrail post (WBS-0019)