Chapter 2: Intermediate Platform
2. Assemble the inside kick plate (23) to the outside support angle (6) at the end of platform floor pan
(7) using flange bolts (2) and flange nuts (3).
NOTE:
Tighten the flange bolts (2) before the platform is installed to the bin.
Figure 2-5
Assembling the inside kick plate (second platform section)
2
5/16 x 3/4 in. flange bolt (S-6606)
7
Platform floor pan (WBS-0011)
3
5/16 in. flange nut (S-3611)
23
Inside kick plate (WBS-0014)
6
Outside support angle (WBS-0015)
18
PNEG-2077
TopDry – Platforms and Bin Stairs