
Chapter 2: Intermediate Platform
4. Install the two platform stiffening straps (16) to the outside handrail kick braces (15) using flange
bolts (2) and flange nuts (3).
Figure 2-12
Installing the platform stiffening straps for first platform
2
5/16 x 3/4 in. flange bolt (S-6606)
15
Outside handrail kick brace (WBS-0020)
3
5/16 in. flange nut (S-3611)
16
Platform stiffening strap (WBS-0083)
PNEG-2077
TopDry – Platforms and Bin Stairs
25