Chapter 2: Intermediate Platform
7. Install the three handrail posts (9) to the outside support angle (6) and platform floor pan (7) in the
second platform section using the flange bolts (2) and flange nuts (3).
NOTE:
• Install the flange bolts (2) with the bolt head towards the inside of the platform.
• Hand tighten the flange bolts (2).
Figure 2-15
Installing the handrail posts for second platform
2
5/16 x 3/4 in. flange bolt (S-6606)
7
Platform floor pan (WBS-0011)
3
5/16 in. flange nut (S-3611)
9
Platform handrail post (WBS-0019)
6
Outside support angle (WBS-0015)