PNEG-1421
Direct Gear Drive Bin Sweep Auger
OPERATION
15.Operation (cont.)
B. For 8" & 10" Systems
Fig. 15-E
1.
Start the unloading auger. The motor is
located on the power head outside the bin
on the unload tube. To find the horsepower
needed for your equipment, use the Horse-
power Chart on page
27
.
2.
Make sure the Center Well Bolt is inserted
through the Rack & Pinion Tube and Center
Well Control Rod.
NOTE: NO
bolt should be
in the Intermediate Well Control Rod. (See
Figure 15–E).
3.
Place wrench on Rack & Pinion and open
center gate until desired flow is established.
It shouldn’t be necessary to open gate more
than 3" to 6".
4.
Always close the center well gate and allow
the unloader to clean out before stopping the
unloader.
5.
When grain flow stops from the center well,
close the center well gate. Insert the
Intermediate Well Bolt through the Intermedi-
ate Well Control Rod and the Center Well
Control Rod (See Figure 15 – E). Remaining
grain should look like Figure 15 – A on
page 29.
6.
Gradually open the gates until the desired
flow of grain is reached. You shouldn’t have
to open the gate more than 2" to 4". The
reaming grain should look like Figure 15 – B
on page 29.
Center Well Control Rod
Rack & Pinion Tube
Well Control Wrench
Center Well Bolt
Intermediate Well Bolt
Intermediate Well Control Rod
Содержание PNEG-1421
Страница 37: ...37 PNEG 1421 Direct Gear Drive Bin Sweep Auger PART LISTS PARTS SECTION...
Страница 39: ...39 PNEG 1421 Direct Gear Drive Bin Sweep Auger PART LISTS Center Well Parts...
Страница 45: ...45 PNEG 1421 Direct Gear Drive Bin Sweep Auger PART LISTS 8 Rack Pinion 10 Rack Pinion 3...
Страница 49: ...49 PNEG 1421 Direct Gear Drive Bin Sweep Auger PART LISTS Reduction Wheel Parts...
Страница 50: ...50 PNEG 1421 Direct Gear Drive Bin SweepAuger NOTES...