17
PNEG-1421
Direct Gear Drive Bin Sweep Auger
INSTALLATION
C. Place the connecting band onto the end of the unload
tube closest to the center well. (See Figure 4-D)
D. Position the unload tube flush against the center well
tube. (See Figure 4-E)
E. Slide the connecting band until it is equally positioned
over both the unload tube and the center well tube.
Position the connecting band so that it will not interfere
with the control rods. (See figure 4-F)
F.
Secure the connecting band with three (3) 5/16" x 1-1/2"
bolts and Whizz nuts, makign sure the intermediate
wells are aligned to the center wells.
4. Unload Tube Installation
(cont.)
Fig. 4-D
Fig. 4-E
Fig. 4-F
Center Well
Unload Tube
Connecting Band
Center Well
Tube
Unload Tube
Control Rod
Whizz
Nuts
Connecting Band
5/16" x 1-1/2" Bolts
Содержание PNEG-1421
Страница 37: ...37 PNEG 1421 Direct Gear Drive Bin Sweep Auger PART LISTS PARTS SECTION...
Страница 39: ...39 PNEG 1421 Direct Gear Drive Bin Sweep Auger PART LISTS Center Well Parts...
Страница 45: ...45 PNEG 1421 Direct Gear Drive Bin Sweep Auger PART LISTS 8 Rack Pinion 10 Rack Pinion 3...
Страница 49: ...49 PNEG 1421 Direct Gear Drive Bin Sweep Auger PART LISTS Reduction Wheel Parts...
Страница 50: ...50 PNEG 1421 Direct Gear Drive Bin SweepAuger NOTES...