![GSI Group PNEG-1421 Скачать руководство пользователя страница 33](http://html1.mh-extra.com/html/gsi-group/pneg-1421/pneg-1421_assembly-and-operation-manual_2275193033.webp)
33
PNEG-1421
Direct Gear Drive Bin Sweep Auger
OPERATION
A. Normal Shutdown.
1.
Before shutting down the unit, be sure the hoppers and augers are empty.
2.
Disconnect and lockout the power source before leaving the work area.
1.
Know how to shutdown the auger in case of an emergency.
3.
Close the bin well control gates.
2.
Do not restart the auger while it is under load.
B. Emergency Shutdown.
NEVER start the equipment under load. Doing so may cause damage. This type of
damage is considered a misuse of the equipment. Any misuse of the equipment may
void the warranty.
4.
Reconnect and unlock the power source.
5.
Clear the auger gradually, until there is no grain and there are no obstructions.
C. Storage Preparation.
1.
Close all wells to the discharge auger.
2.
Position the direct gear drive sweep directly over the intermediate wells.
Make sure that the clutch control rods are disengaged.
3.
Be sure the unload tube is empty.
5.
Make sure all fasteners are tight.
4.
Shutdown the auger.
DO NOT enter the grain bin unless all power driven equipment has been shutdown.
18. Shutdown
Содержание PNEG-1421
Страница 37: ...37 PNEG 1421 Direct Gear Drive Bin Sweep Auger PART LISTS PARTS SECTION...
Страница 39: ...39 PNEG 1421 Direct Gear Drive Bin Sweep Auger PART LISTS Center Well Parts...
Страница 45: ...45 PNEG 1421 Direct Gear Drive Bin Sweep Auger PART LISTS 8 Rack Pinion 10 Rack Pinion 3...
Страница 49: ...49 PNEG 1421 Direct Gear Drive Bin Sweep Auger PART LISTS Reduction Wheel Parts...
Страница 50: ...50 PNEG 1421 Direct Gear Drive Bin SweepAuger NOTES...