background image

Setting language 

Knock  to  make  the  display  bright

knock  to“set  language”

double  knock  to 

enter“language:  English”

knock  to  select  the  language  you  need  and  wait  until 

the display become dark.

Setting luminance of the display

Knock  to  make  the  display  bright 

knock  to“set  LCD  contrast”

double  knock  to 

enter“LCD contrast 2”

knock to select the luminance you need and wait until the 

display become dark.

Setting communication address

Knock to make the display bright-->knock to “COM Address:xx” -->double knock to 
change the Address model-->clock to set address.

Setting frequency

Knock  to  make  the  display  bright

knock  to“System  F:  xxHz 

double  knock  to 

enter“System F: xxHz”

knock to select the Frequency you need and wait until the 

display become dark.

Auto test

1

.

Let the inverter work at normal status, Knock to make the display bright ->knock 

to “Enable Auto test”, then double knock to enter ”  Connect to PC ”;

2

.

Connect the inverter to PC by RS232, and open the “ShineBox.exe”, select page 

”2.Auto test”, and input the COM port, click the “Test” button to start the auto test;

18

19

1.

Step  flow  is  max  voltage  ->  min  voltage  ->  max  frequency  ->  min  frequency 

protection test;

2. 

For each step, the protection actives when the grid real value reached the limit 

value; and the limit value is initialed as the ENEL spec, and is increased or decreased 
every second, the voltage step is 1V/s, and the frequency is 0.05Hz/s;

3. 

For the protection time, the time counter is reset when the limit is changed, and 

is  recorded  when  the  protection  active.  And  then  check  the  protection  time  is  the 

range of the spec or not.

4. 

When testing, if the PC software sends commands to read the testing data, the 

inverter  will  return  all  the  test  data  to  the  PC.  The  pc  software  will  display  the  test 

state and save the test data in the file.

Auto test design model

Auto test Process : 

1. 

Click Start Test, first read the serial number and firmware version;

2.

 

 After starting the test, read the inverter status real-time

3

.

 check the info on the software and the inverter;

4

.

 after the test ended or stopped, open the file “Auto test report of xxxxxxxxxx.txt” 

under the software directory(xxx… is the serial No. of the inverter), you can check the 
result of the test is pass or fail.

Содержание Growatt 3600 MTL

Страница 1: ...ding Xicheng Industrial Zone Bao an District Shenzhen P R China 86 755 2747 1900 86 755 2749 1460 service ginverter com www ginverter com T F E W Installation Operation Manual Growatt 3600MTL Growatt...

Страница 2: ...TION location 4 3 Fixed the mounting on the wall 4 4 Fixed the inverter on the wall 4 5 Check Ivewrter installation Status Electrical Connection 5 1 System Diagram with Inverter Electrical connection...

Страница 3: ...of this device Qualified personnel are trained to deal with the dangers and hazards involved in installing electric devices Contact Display 6 1 LCD display 6 2 LCD control 6 3 Setting the LCD display...

Страница 4: ...connected to a stand alone grid The energy generated is consumed directly on site surplus energy can be stored in batteries DC and AC Switch Separate the Growatt securely from the grid and the PV gen...

Страница 5: ...ot remove the casing until at least 5 minutes after disconnecting all power sources This unit is designed to feed power to the public power grid utility only Do not connect this unit to an AC source o...

Страница 6: ...on The installation method and mounting location must be suitable for the weight and dimensions of the inverter Select a wall or solid vertical surface that can support the PV Inverter Mount on a soli...

Страница 7: ...connected it controls the current amplitude according to the PV Panel power supply Inverter always tries to convert the maximum power from your PV panel s Connection system This interface between Uti...

Страница 8: ...orrect polarity connection could permanently damage the unit Check short circuit current of the PV string The total short circuit current of the PV string should be less than the inverter s maximum DC...

Страница 9: ...and Germany is the second selection B Fig 5 5 1 Fig 5 5 2 When you need to select any of these countries you can Double knock to enter the next interface Here we select Italy as an example as Fig 5 5...

Страница 10: ...6 1 LCD display Starting up display sequence once the PV power is sufficient inverter displays information as shown in the flow chart as follow Module xxxxxx SerNo xxxxxxxxxx FW Version x x x Connect...

Страница 11: ...the display language luminance of the display auto test and frequency When the LCD is dark Knock and double knock make it becomes bright Knock to make it display next information or change the set si...

Страница 12: ...ort click the Test button to start the auto test 18 19 1 Step flow is max voltage min voltage max frequency min frequency protection test 2 For each step the protection actives when the grid real valu...

Страница 13: ...If the power is insufficient voltage 120VDC Inverter enters a waiting state Whilst waiting Inverter uses just enough power from the PV panel monitor internal system status In normal mode the LED is g...

Страница 14: ...UNICATIONS 9 9 1 Communications software instructions ShineNET is a PC software that communicate with Shine Inverter to analyze the inverter working state It is convenient for you to know the inverter...

Страница 15: ...connection cables 3 Check grid usability 24 25 SPECIFICATIONS 13 Input Data Max input current of the MPP tracker Max DC power Max DC voltage PV voltage range MPPT Full load voltage Initial feeding vol...

Страница 16: ...510 188 24 KG Operating ambient temperature range 25 C 60 C 25 C 60 C 25 C 60 C Continuous full output power temperature range 25 C 50 C 25 C 50 C 25 C 50 C Protection degree IP 65 IP 65 IP 65 Outdoo...

Страница 17: ...roduction loss of revenues are therefore specifically and without limitation excluded to the extent legally permissible GROWATT s aggregate liability if any in damages or otherwise shall not exceed th...

Страница 18: ...ot cover transportation costs in connection with the return of defective modules The cost of the installation or reinstallation of the modules shall also be expressly excluded as are all other related...

Отзывы: