10 

TROUBLE SHOOTING

In  most  situations,  the  Inverter  requires  very  little  service.  However,  if  Inverter  is  not 

able  to  work  perfectly,  please  refer  to  the  following  instructions  before  calling  your 

local dealer.

Should any problems arise, the LED on the front panel will be red and the LCD displays 

the  relevant  information.  Please  refer  to  the  following  table  for  a  list  of  potential 

problems and their solutions.

11 

SYSTEM FAULT

Ground Fault

Isolation Fault

1.

 The ground current is too high.

2.

 Unplug the inputs from the PV generator and check the peripheral AC system.

3.

 After the cause is cleared, re-plug the PV panel and check PV-Inverter status.

4. 

If the problem persists please call service.

1.

 Check the impedance is between PV (+) & PV (-) and the PV-Inverter is earthed. 

       The impedance must be greater than 8M.

2.

 If the problem persists please call service. 

 

No Utility

1. 

Grid is not connected.

2.

 Check grid connection cables.

3.

 Check grid usability. 

24

25

SPECIFICATIONS 

13

Input Data

Max. input current of the

MPP tracker

Max. DC power

Max. DC voltage

PV voltage range MPPT

Full load voltage

Initial feeding voltage

Max. number of parallel

strings

Number of MPP trackers

3600MTL

10A/10A

3800W

600V

120V-550V

250V-540V

150V

2/2

2(can parallel)

4200MTL

15A/15A

4400W

600V

120V-550V

250V-540V

150V

2/2

2(can parallel)

5000MTL

15A/15A

5200W

600V

120V-550V

250V-540V

150V

2/2

2(can parallel)

INVERTER FAILURE

 

12

PV Over Voltage

1.

 Check the open PV voltage, see if it is greater than or too close to 600VDC. 

2. 

If PV voltage is less than 600VDC, and the problem still occurs, please call 

        local service. 

Consistent Fault

1. 

Disconnect PV (+) or PV (-) from the input, restart the PV-Inverter.

2.

 If it does not work, call service. 

       > If there is no display on the panel, please check PV-input connections. 
          If the voltage is higher than 150V, call your local service. 

      > During periods of little or no sunlight, the PV-Inverter may continuously 
          start up and shut down. This is due to insufficient power generated to 
          operate the control circuits

Содержание Growatt 3600 MTL

Страница 1: ...ding Xicheng Industrial Zone Bao an District Shenzhen P R China 86 755 2747 1900 86 755 2749 1460 service ginverter com www ginverter com T F E W Installation Operation Manual Growatt 3600MTL Growatt...

Страница 2: ...TION location 4 3 Fixed the mounting on the wall 4 4 Fixed the inverter on the wall 4 5 Check Ivewrter installation Status Electrical Connection 5 1 System Diagram with Inverter Electrical connection...

Страница 3: ...of this device Qualified personnel are trained to deal with the dangers and hazards involved in installing electric devices Contact Display 6 1 LCD display 6 2 LCD control 6 3 Setting the LCD display...

Страница 4: ...connected to a stand alone grid The energy generated is consumed directly on site surplus energy can be stored in batteries DC and AC Switch Separate the Growatt securely from the grid and the PV gen...

Страница 5: ...ot remove the casing until at least 5 minutes after disconnecting all power sources This unit is designed to feed power to the public power grid utility only Do not connect this unit to an AC source o...

Страница 6: ...on The installation method and mounting location must be suitable for the weight and dimensions of the inverter Select a wall or solid vertical surface that can support the PV Inverter Mount on a soli...

Страница 7: ...connected it controls the current amplitude according to the PV Panel power supply Inverter always tries to convert the maximum power from your PV panel s Connection system This interface between Uti...

Страница 8: ...orrect polarity connection could permanently damage the unit Check short circuit current of the PV string The total short circuit current of the PV string should be less than the inverter s maximum DC...

Страница 9: ...and Germany is the second selection B Fig 5 5 1 Fig 5 5 2 When you need to select any of these countries you can Double knock to enter the next interface Here we select Italy as an example as Fig 5 5...

Страница 10: ...6 1 LCD display Starting up display sequence once the PV power is sufficient inverter displays information as shown in the flow chart as follow Module xxxxxx SerNo xxxxxxxxxx FW Version x x x Connect...

Страница 11: ...the display language luminance of the display auto test and frequency When the LCD is dark Knock and double knock make it becomes bright Knock to make it display next information or change the set si...

Страница 12: ...ort click the Test button to start the auto test 18 19 1 Step flow is max voltage min voltage max frequency min frequency protection test 2 For each step the protection actives when the grid real valu...

Страница 13: ...If the power is insufficient voltage 120VDC Inverter enters a waiting state Whilst waiting Inverter uses just enough power from the PV panel monitor internal system status In normal mode the LED is g...

Страница 14: ...UNICATIONS 9 9 1 Communications software instructions ShineNET is a PC software that communicate with Shine Inverter to analyze the inverter working state It is convenient for you to know the inverter...

Страница 15: ...connection cables 3 Check grid usability 24 25 SPECIFICATIONS 13 Input Data Max input current of the MPP tracker Max DC power Max DC voltage PV voltage range MPPT Full load voltage Initial feeding vol...

Страница 16: ...510 188 24 KG Operating ambient temperature range 25 C 60 C 25 C 60 C 25 C 60 C Continuous full output power temperature range 25 C 50 C 25 C 50 C 25 C 50 C Protection degree IP 65 IP 65 IP 65 Outdoo...

Страница 17: ...roduction loss of revenues are therefore specifically and without limitation excluded to the extent legally permissible GROWATT s aggregate liability if any in damages or otherwise shall not exceed th...

Страница 18: ...ot cover transportation costs in connection with the return of defective modules The cost of the installation or reinstallation of the modules shall also be expressly excluded as are all other related...

Отзывы: