background image

SerialNO. : XXXXXXXXXX
FW Version : S.1.9
Test Date : 22/07/2011
Start Time : 19:43:50

Max Voltage
Limit Value : 270.0 V -- 40 ms
Trip Value : 222.0 V -- 40 ms
Step Result : PASS

Min Voltage
Limit Value : 190.0 V -- 40 ms
Trip Value : 222.0 V -- 40 ms
Step Result : PASS

Max Freqency
Limit Value : 50.27 Hz -- 40 ms
Trip Value : 50.02 Hz -- 40 ms
Step Result : PASS

Min Freqency
Limit Value : 49.73 Hz -- 40 ms
Trip Value : 49.98 Hz -- 40 ms
Step Result : PASS 

3. 

First  test  over-voltage  protection,  read  the  limit  value,  time  value,  protection 

value;

4. 

The second step test under-voltage protection, read the limit value, time value, 

protection value;

5.

 

The  third  step  test  over-frequency  protection,  read  the  limit  value,  time  value, 

the protection value;

6. 

The  fourth  step  test  under-frequency  protection,  read  the  limit  value,  time 

value, the protection value;

7. 

Upon completion of these four steps to complete the test and production test 

display the document, as follows:

20

21

MODES OF OPERATION

 

 7

There are 3 different modes of operation.

7.1 Normal mode

In this mode, Inverter works normally. Whenever the supplied power from PV panel is 

sufficient (voltage>150VDC), Inverter converts power to the grid as generated by the 

PV panel. If the power is insufficient(voltage<120VDC) 

Inverter enters a “waiting” 

state.  Whilst “waiting” Inverter uses just enough power from the PV panel monitor 

internal system status. In normal mode the LED is green.

7.2 Fault mode

The  internal  intelligent  controller  can  continuously  monitor  and  adjust  the  system 

status.  If Inverter finds any unexpected conditions such as grid problems or internal 

failure, it will display the information on its LCD and the LED will be red.

7.3 Shutdown mode

During periods of little or no sunlight, Inverter automatically stops running.  In this 
mode, Inverter does not take any power from the grid. The display and LED’s on the 
front panel do not work.

Notes

Operating  inverter  is  quite  easy.  During  normal  operation,  Inverter  runs 

automatically. However, to achieve maximum conversion efficiency of Inverter

please read the following information:

Automatic ON-OFF: Inverter starts up automatically when DC-power from the PV 

panel is sufficient. 
Once the PV-Inverter starts it enters one of the following 3 states: 

1. 

Standby:  The  PV  string  can  only  provide  just  enough  voltage  to  minimum

         requirements  of  the  controller. 

2. 

Waiting:  When  the  PV  string  DC  voltage  is  greater  than  100V,  Inverter  enters       

         “waiting”  state  and  attempts  to  connect  to  the   grid. 

3. 

Normal  operation:  When  PV  string  DC  voltage  is  greater  than  150V,  Inverter  

         operates  in  the  normal  state.

Содержание Growatt 3600 MTL

Страница 1: ...ding Xicheng Industrial Zone Bao an District Shenzhen P R China 86 755 2747 1900 86 755 2749 1460 service ginverter com www ginverter com T F E W Installation Operation Manual Growatt 3600MTL Growatt...

Страница 2: ...TION location 4 3 Fixed the mounting on the wall 4 4 Fixed the inverter on the wall 4 5 Check Ivewrter installation Status Electrical Connection 5 1 System Diagram with Inverter Electrical connection...

Страница 3: ...of this device Qualified personnel are trained to deal with the dangers and hazards involved in installing electric devices Contact Display 6 1 LCD display 6 2 LCD control 6 3 Setting the LCD display...

Страница 4: ...connected to a stand alone grid The energy generated is consumed directly on site surplus energy can be stored in batteries DC and AC Switch Separate the Growatt securely from the grid and the PV gen...

Страница 5: ...ot remove the casing until at least 5 minutes after disconnecting all power sources This unit is designed to feed power to the public power grid utility only Do not connect this unit to an AC source o...

Страница 6: ...on The installation method and mounting location must be suitable for the weight and dimensions of the inverter Select a wall or solid vertical surface that can support the PV Inverter Mount on a soli...

Страница 7: ...connected it controls the current amplitude according to the PV Panel power supply Inverter always tries to convert the maximum power from your PV panel s Connection system This interface between Uti...

Страница 8: ...orrect polarity connection could permanently damage the unit Check short circuit current of the PV string The total short circuit current of the PV string should be less than the inverter s maximum DC...

Страница 9: ...and Germany is the second selection B Fig 5 5 1 Fig 5 5 2 When you need to select any of these countries you can Double knock to enter the next interface Here we select Italy as an example as Fig 5 5...

Страница 10: ...6 1 LCD display Starting up display sequence once the PV power is sufficient inverter displays information as shown in the flow chart as follow Module xxxxxx SerNo xxxxxxxxxx FW Version x x x Connect...

Страница 11: ...the display language luminance of the display auto test and frequency When the LCD is dark Knock and double knock make it becomes bright Knock to make it display next information or change the set si...

Страница 12: ...ort click the Test button to start the auto test 18 19 1 Step flow is max voltage min voltage max frequency min frequency protection test 2 For each step the protection actives when the grid real valu...

Страница 13: ...If the power is insufficient voltage 120VDC Inverter enters a waiting state Whilst waiting Inverter uses just enough power from the PV panel monitor internal system status In normal mode the LED is g...

Страница 14: ...UNICATIONS 9 9 1 Communications software instructions ShineNET is a PC software that communicate with Shine Inverter to analyze the inverter working state It is convenient for you to know the inverter...

Страница 15: ...connection cables 3 Check grid usability 24 25 SPECIFICATIONS 13 Input Data Max input current of the MPP tracker Max DC power Max DC voltage PV voltage range MPPT Full load voltage Initial feeding vol...

Страница 16: ...510 188 24 KG Operating ambient temperature range 25 C 60 C 25 C 60 C 25 C 60 C Continuous full output power temperature range 25 C 50 C 25 C 50 C 25 C 50 C Protection degree IP 65 IP 65 IP 65 Outdoo...

Страница 17: ...roduction loss of revenues are therefore specifically and without limitation excluded to the extent legally permissible GROWATT s aggregate liability if any in damages or otherwise shall not exceed th...

Страница 18: ...ot cover transportation costs in connection with the return of defective modules The cost of the installation or reinstallation of the modules shall also be expressly excluded as are all other related...

Отзывы: