![Groen groen TDBCCE Series Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/groen/groen-tdbcce-series/groen-tdbcce-series_operators-manual_2268385006.webp)
6 OM-TDB/TDBC-CE
Inspection & Unpacking
CAUTION
SHIPPING STRAPS ARE UNDER TENSION
AND CAN SNAP BACK WHEN CUT. TAKE
CARE TO AVOID PERSONAL INJURY OR
DAMAGE TO THE UNIT BY STAPLES LEFT
IN THE WALLS OF THE CARTON.
The unit will arrive in a heavy shipping crate and will be attached to a skid. Immediately
upon receipt, inspect the carton carefully for exterior damage.
Carefully remove the upper portion of the crate to free the unit on its skid. Cut the straps
securing the kettle to the skid.
Thoroughly inspect the unit for concealed damage. Report any shipping damage or
incorrect shipments to the delivery agent.
Write down the model number, serial number, and installation date, and retain this
information for future reference. Space for these entries is provided at the top of the
Service Log at the back of this manual. Keep this manual on file and available for
operators to use.
When installation is to begin, carefully cut the straps which hold the unit on the skid. Lift
the unit straight up off the skid. Examine packing materials to be sure loose parts are not
discarded with the materials.
Attach the tilt handle (normally shipped inside the kettle) by carefully threading it into the
socket on the trunnion support. Be careful to avoid cross-threading fine socket threads.
This step is unnecessary if the kettle is a crank tilt model.
CAUTION
THIS UNIT WEIGHS 64 TO 74 KG (140 TO 163
LBS). INSTALLER SHOULD OBTAIN HELP AS
NEEDED TO LIFT THIS WEIGHT SAFELY.
The TDB(C) is shipped from the factory strapped
on a pallet. If the unit is a pull tilt model, the
handle is packed inside the kettle for shipment.