16 OM-TDB/TDBC-CE
Operational & Maintenance Safety
OPERATION
1. Initial Operational Readiness Check
After the TDB(C) Kettle has been installed according to service and installation
instructions, perform initial start-up as a test, to ensure that the unit is operating
correctly.
a. Remove all literature and packing material from the interior and exterior of
the unit.
b. Make sure electricity supply is switched on.
c. Ensure that the kettle is filled with water.
d. Check the water level in the jacket. The level should be between the lines
on the gauge glass. If the level is low, the jacket water level will be required
to be topped up. (This will require a service call).
e. Check the pressure gauge. If the gauge does not show sufficient vacuum
(20 to 30 below zero) or -0.7 to -1.0 Bar, then the jacket will require
venting. (This will require a service call).
f. Switch the power switch to the “On” position. The POWER lamp will
illuminate.
g. Turn the thermostat dial to the required setting. The HEAT lamp will
illuminate.
2. To Shut Down Kettle
a. Turn the thermostat dial to the “O” position.
b. Switch the power switch to the OFF position.
c. For a prolonged shut down, turn the electricity mains off.
Follow steps a and b.
3. Filling the Kettle
Prior to operation, thoroughly clean the kettle using hot water and detergent.
Kettle capacities:
Model
Maximum Capacity
Recommended
Capacity
TDB(C)-20
18.9 liters
16 liters
TDB(C)-24
22.6 liters
19 liters
TDB(C)-40
37.6 liters
32 liters
TDB(C)-48
45.3 liters
38 liters
To prevent surge boiling, no more than 80% of the maximum capacity should be
used.
4. Users Thermostat
Provides automatic control of the Kettle Jacket temperature at settings up to
295°F (146°C) maximum.
5. Sequence of Operation
The following “action-reaction” outline is provided to help the user understand
how the equipment works. When the operator starts up the kettle by turning the
operating thermostat dial from “O” to a desired setting, the thermostat switch
closes. This lights up the heating indicator light and causes the contactors to
close, allowing power to flow to heating elements.
WARNING
INSTALLATION OF THE UNIT MUST BE DONE
BY PERSONNEL QUALIFIED TO WORK WITH
ELECTRICITY AND PLUMBING IN
ACCORDANCE WITH ALL APPLICABLE CODES.
BEFORE REPLACING ANY PARTS,
DISCONNECT THE UNIT FROM THE ELECTRIC
POWER SUPPLY. TO PREVENT SHOCKS, ALL
APPLIANCES WHETHER GAS OR ELECTRIC,
MUST BE EARTHED.
CAUTION
BE SURE ALL OPERATORS READ,
UNDERSTAND, AND FOLLOW THE OPERATING
INSTRUCTIONS, CAUTIONS AND SAFETY
INSTRUCTIONS CONTAINED IN THIS MANUAL.
WARNING
AVOID CONTACT WITH THE FLUE. SURFACES
ARE VERY HOT AND WILL CAUSE BURNS. DO
NOT OBSTRUCT FLUE OPENING.