-32-
g0679 stroke/Edge sander
belt Tension Leadscrew
Clean the belt tension leadscrew with mineral
spirits and a rag or brush to remove any grime.
dry the leadscrew, then brush on a thin coat of
light multi-purpose grease. use the belt tension
handwheel to tighten and loosen the belt several
times to disperse the grease (
figure 56
).
Table Elevation chain
Clean the table elevation chain with mineral spirits
and a rag or brush to remove any grime. to ensure
complete cleaning of the chain, raise and lower
the table to expose the entire length of chain. dry
the chain, then spray on a chain lubricant. raise
and lower the table several times to disperse the
lubricant (
figure 56
).
Table Elevation Gearbox
after every 500 hours of use, the table elevation
gearbox must be refilled. use a rag to clean any
grime from around the filler plug, then remove the
filler plug and use a manual oiler to add oil until
the gearbox is full. replace the filler plug (
figure
57
).
figure 56.
Belt tension leadscrew.
figure 56.
Table elevation chain.
figure 57.
Table elevation gearbox.
Belt tension
leadscrew
table Elevation Chain
Filler plug
Содержание G0679
Страница 15: ...G0679 Stroke Edge Sander 13 Hardware Recognition Chart...
Страница 42: ...40 G0679 Stroke Edge Sander Main Breakdown SECTION 9 PARTS...
Страница 44: ...42 G0679 Stroke Edge Sander Belt Idler Wheel Assembly Breakdown...
Страница 47: ...G0679 Stroke Edge Sander 45 Right Upright Assembly Breakdown...
Страница 49: ...G0679 Stroke Edge Sander 47 Left Upright Assembly Breakdown...