
43
Screw the flange and
hollow out the liner
• The liner should be well-tensed. Continue with the installation until the water
reaches 10 cm below the skimmer.
• Before continuing, make sure that the skimmer flap is well positioned.
• Mark the position of the fixing screws on the liner with a felt-tip pen.
• Position the second square flat seal (G) and the flange (F) against the liner, ali-
gning the holes with the position marks of the screws.
• Fix the flange (F) on the liner with 10 TF screws 5 x 25 starting at the top. The
pressure of fixing points on the liner should be constant, (fixing in cross)
• Cut the liner with a cutter from the inside of the skimmer.
• Now you should install the filter.
After finishing the fixing, hollow out the liner following the flange.
G
F
Liner
Figure 44
Place the seal
over the flange
Locate and mark th
e
position of th
e screws
Pool cleaner
connector
Skimmer cover
Connector tube
Base board of the pool
cleaner connector
Skimmer basket
Skimmer flap
Skimmer body
Connector tube
Flange
trimming
Square flat seal
Protection flange
TB screw 5 x 25
stainless steel
TB screw 5 x 25
stainless steel
SKIMMER
Look for us in our YouTube
channel to help you with
the assembly.
Содержание KWOV436
Страница 2: ......