
25
B3
E3
F7
G3
G3
G3
F7
F16
F16
D3
C3
E3
Figure 20
7
th
board
larger diameter
on exterior
skimmer
location
nozzle
location
Figure 19
Skimmer:
• Place the specific boards for the skimmer facing the prevailing
winds. Boards
C3
and
D3
will always be placed over a panel
starting by board
B3
(figure 19).
The skimmer will not be stable until the pool is filled.
SPECIFIC BOARDS:
Refilling fitting:
• Place the specific board for the refilling fitting
E3
situating the larger diameter on the
external side of the pool.
Prevailing
winds
internal side
cut-outs
external side view
internal side view
The skimmer
(with its flap)
is fitted as
the same
time as the finishing
board.
Содержание KWOV436
Страница 2: ......