background image

Installing EMI Compliance Components

PDR 100 Fibre Channel Installation

67

2. Refer to Figures 24, 25, and 27 and replace the front panel and LED cable 

assemblies.

3. Refer to Figure 26 and reinstall the front panel metal plate, bezel, and 

handles.

Figure 27. Installing the Front Panel and LED Cable Assemblies

9674-28

Содержание Profile PDR 100

Страница 1: ...F I B R E C H A N N E L N E T W O R K I N G Installation Manual PROFILE PDR 100 P R O F E S S I O N A L D I S K R E C O R D E R S 071 8072 00 NOVEMBER 2000 ...

Страница 2: ...leygroup com Disclaimer Product options and specifications subject to change without notice The information in this manual is furnished for informational use only is subject to change without notice and should not be construed as a commitment by Grass Valley Group Grass Valley Group assumes no responsibility or liability for any errors or inaccuracies that may appear in this publication U S Govern...

Страница 3: ... 100 BaseT Ethernet Board 18 PCI Interconnect Board 18 Front Panel Cable Assembly 19 LED Cable 19 EMI Foam Gasket 19 Fibre Channel Cable 19 Ethernet Cable 20 Sticker Sets 20 Accessories 21 Networking Overview 23 Network Configurations 23 Network Models 23 Networking Several Profile Systems 24 Networking Several Hubs 25 Building a Fibre Channel Network 26 Electrostatic Precautions 27 Installation P...

Страница 4: ...Installing the Fibre Channel Board 58 Reinstalling Internal Cables 59 Installing the PCI Interconnect Board 60 Reinstalling Board Retainer Brackets 62 Installing EMI Compliance Components 64 Attaching Slot ID Stickers 69 Replacing the Profile Covers 70 Reinstalling the Profile Chassis into the Rack 71 Cable Connections 71 Installation Verification 72 Configuring the System 73 System Set up for Eth...

Страница 5: ...ng 49 14 Board Slot IDs Rear Panel 51 15 Slave EDR Master EDR and Fibre Channel Board Locations 52 16 Short Board Installation Example Top View 54 17 Distinguishing Between Master and Slave EDRs 56 18 Installing a Full Size Board Example 57 19 SCSI Cable Connections 59 20 PCI Interconnection Board 60 21 PCI Interconnect Board Installation 61 22 Short Board Retainer Bracket and Extender 62 23 Board...

Страница 6: ...nnel Profile Fibre Channel Upgrade Kit Contents 16 2 Fibre Channel Networking Accessories 22 3 Board I O Requirements and Restrictions 39 4 Board location chart 41 5 Example 1 Installing the Fibre Channel Upgrade 45 6 Example 2 Installing a Mix Effects Board 47 ...

Страница 7: ...24 hour Emergency Hotline 530 478 4148 Contract and warranty customers World Wide Web http www grassvalleygroup com support FTP Site ftp grassvalleygroup com E mail profile users grassvalleygroup com France 01 45 29 73 00 United Kingdom 01628 405830 Germany 49 221 1791 234 Other 44 1753 218 777 Italy 02 25086606 Australia from overseas 02 9888 0100 61 2 9888 0100 Japan 81 3 3448 3111 Korea 82 2 52...

Страница 8: ...jury Precautions Do Not Service Alone Do not perform internal service or adjustment of this product unless another person capable of rendering first aid and resuscitation is present Disconnect Power To avoid electric shock while servicing disconnect the main power by means of the power cord Use Care When Servicing With Power On Dangerous voltages or currents may exist in this product Disconnect po...

Страница 9: ...e proper position for the power source before applying power Provide Proper Ventilation Prevent product overheating by providing proper ventilation Do Not Operate If You Suspect Product Failures If you suspect there is damage to this product have it inspected by qualified service personnel Safety Terms and Symbols Terms in This Manual These terms may appear in this manual WARNING Warning statement...

Страница 10: ...jury hazard immediately accessible as you read the marking WARNING indicates a personal injury hazard not immediately accessible as you read the marking CAUTION indicates a hazard to property including the product Symbols on the Product The following symbols may appear on the product DANGER high voltage Protective ground earth terminal ATTENTION refer to manual ...

Страница 11: ...l be required to correct the interference at his or her own expense Changes or modifications not expressly approved by Grass Valley Group can affect emission compliance and could void the user s authority to operate this equipment Canadian EMC Notice of Compliance This digital apparatus does not exceed the Class A limits for radio noise emissions from a digital apparatus set out in the Radio Inter...

Страница 12: ...pment including Electrical Business Equipment Third Edition 1995 IEC 950 Safety of Information Technology Equipment including Electrical Business Equipment Second edition 1991 CAN CSA C22 2 No 950 95 Safety of Information Technology Equipment including Electrical Business Equipment EN60950 Safety of Information Technology Equipment including Electrical Business Equipment includes Appendix ZB ...

Страница 13: ...eceiving inspection of the Fibre Channel Kit Kit Contents Installation Procedure Configuring the system for Ethernet Verifying that the Fibre Channel is correctly installed Once you have installed the Fibre Channel upgrade your Profile system must be configured to use the Fibre Channel network See the Profile Family User Manual for Fibre Channel configuration and use information NOTE The Fibre Cha...

Страница 14: ...rements for installing and using the PDR100 Fibre Channel upgrade are Window NT operating system V3 51 or higher Profile System Software V2 1 or higher An Ethernet LAN board Tools Required Tools required but not supplied to install the kit are Torx screwdriver with T10 and T15 tips Static discharge wrist strap ...

Страница 15: ...very effort to ensure that you receive a complete and intact kit Carefully unpack the kit and check the contents against the invoice or shipping manifest If any discrepancies are found notify your Grass Valley Group representative immediately Inspect each component for any signs of damage Especially note that cables are not kinked and that connector pins are not broken or bent If any damage is fou...

Страница 16: ...ted in Table 1 and shown in Figure 1 except the EDR Slave board Table 1 4 Channel Profile Fibre Channel Upgrade Kit Contents Name Part Number Fibre Channel Board 672 1462 XX Master EDR Board 671 3795 XX Slave EDR Board 671 3757 XX 10 100 BaseT Ethernet Board 118 9403 XX PCI Interconnect Board 671 3794 XX Front Panel Cable Assy w Ferrite Bead 174 3459 XX LED Cable Assy w Ferrite Bead 174 3471 XX Ga...

Страница 17: ...nstallation 17 Figure 1 4 Channel Fibre Channel Kit Contents 9674 1 Enhanced Disk Recorder Boards PCI Board Fibre Channel Board 10 100 Base T Board LED Cable Front Panel Cable Label Sets EMI Gasket 5 49 meter Ethernet Cable 5 meter Fibre Channel Cable ...

Страница 18: ...rd provides the functionality to network numerous Profile systems Master Enhanced Disk Recorder Board The Master Enhanced Disk Recorder MEDR board provides high bandwidth data transfers from disk to and from video channels and the Fibre Channel board Additionally the i960 enhancements include a Global PCI a Local PCI LPCI and the i960 processor Slave Enhanced Disk Recorder Board The Slave Enhanced...

Страница 19: ...mbers lower than B041685 EMI Foam Gasket This is EMI foam gasket is installed to insure that your Profile system remains EMI compliant Installation of this gasket is only necessary on Profile systems with serial numbers lower than B041685 Fibre Channel Cable The cable connecting the Profile system to a Hub is a 5 meter copper wire cable with a DB 9 connector on each end Note that other lengths of ...

Страница 20: ...hernet cable is a 5 49 meter standard Ethernet cable with RJ 45 connectors on each end Sticker Sets A standard set of stickers and a Fibre Channel set of stickers are provided so that your Profile board IDs at the back of the chassis can be updated after the installation of the Fibre Channel kit ...

Страница 21: ...e than 25 meters from the Fibre Channel hub switch or another Profile system needs a fiber optic cable and copper to fiber cable adapters Figure 2 shows an example of connecting Profile systems up to and more than 25 meters apart Figure 2 Example Profile System Fibre Channel Connections The hubs switches and the adapters are not part of this Fibre Channel kit but may be purchased separately by con...

Страница 22: ...Copper to Fiber Cable Adapter is made from Gallium Aluminum Arsenide Check with your local environmental authorities for proper disposal of a malfunctioning adapter Table 2 Fibre Channel Networking Accessories Name Part Number Ethernet Hub PNETHUB Fibre Channel Hub PNFCHUB Cable Adapter Copper to Fiber PNF0MIA 9674 2 Ethernet Hub Fibre Channel Hub 9674 21 Fiber optic Connector Covers ...

Страница 23: ...es Fibre Channel provides connectivity for high speed media data transfers between Profile systems Using Fibre Channel to network groups of greater than two Profile systems requires an existing Ethernet network LAN or an Ethernet hub and a Fibre Channel hub Network Models The following discusses two examples of Ethernet and Fibre Channel networking The first example shows connection of several Pro...

Страница 24: ...sconnection of machines without rewiring If you want to connect more than two Profile systems together for video networking you will need to connect each system to an Ethernet hub or an existing Ethernet network and a Fibre Channel Hub Figure 5 shows an example of this networking Figure 5 Basic Hub Connections 0033 9 Profile1 Profile2 Profile3 Ethernet Hub Fibre Channel Hub ...

Страница 25: ...re systems to the network Large Fibre Channel networks will probably not perform as well as smaller ones due to bandwidth limitations Figure 6 shows a simple use of several hubs Figure 6 Using Several Hubs 0033 10 Profile4 Profile5 Profile6 Ethernet Hub 1 Ethernet Hub 2 Fibre Channel Hub 2 Fibre Channel Hub 1 Profile1 Profile2 Profile3 ...

Страница 26: ...nstallation for initial setup to ensure that all components are working and correctly configured before adding additional Profile systems to your Fibre Channel network Figure 7 Point to point Fibre Channel Network Connection The Ethernet connection shown in Figure 7 links the two LAN cards in each Profile system These cables may be twisted pairs up to 30 meters in length The Fibre Channel connecti...

Страница 27: ...it boards Handle all circuit boards in a static protected area capable of controlling static charge on conductive materials people and non conductive materials Static protected areas include non static table tops and non static floor mats Use a static discharge wrist strap when handling circuit boards Handle the circuit boards only by the edges Avoid touching the printed wires on the back of the c...

Страница 28: ...rformed by qualified service personnel The procedures listed below take you step by step through the installation of the Fibre Channel upgrade Preparing the Profile system for the upgrade Installing the upgrade Verifying post installation operability NOTE Unless otherwise instructed do not discard any items removed from the Profile system ...

Страница 29: ...ard brackets removal Removing the old Master Disk Recorder board and if installed the old Slave Disk Recorder board A board location guide and audio clock cabling information is included to assist you if you must move boards around in order to install the Fibre Channel upgrade Enable the Network Network services must be running regardless of whether or not you currently have a LAN board installed ...

Страница 30: ...ile chassis to the rack 2 Use the Profile chassis front panel handles to slide the chassis out of the rack until the rack slide locks engage WARNING The Profile chassis is too heavy for one person to remove from an equipment rack To avoid possible injury to personnel or damage to the equipment get help when removing the Profile chassis from the rack 3 Being sure to fully support the Profile chassi...

Страница 31: ...0 tip to remove the top screws and use the T15 tip to remove the side screws if present which secure the disk drive cover Ê to the chassis and remove the cover 2 Use the Torx tool with the T10 tip to remove the screws which secure the board area cover Ë Figure 8 Profile Top Covers Removal 2 1 9496 1 ...

Страница 32: ...oved to remove any full size boards This bracket has extenders which may be moved to adapt to the locations of any short boards See Figure 9 for locations and removals of the two board retainer brackets To remove the board hold down brackets refer to Figure 9 and 1 Use the Torx tool with the T10 bit to remove retaining screw Ê for the top slotted bracket from the side of the Profile chassis 2 Lift...

Страница 33: ...Preparing the Profile System PDR 100 Fibre Channel Installation 33 Figure 9 Board Retainer Brackets Removal 9674 13 1 3 4 2 ...

Страница 34: ... connector Ëfrom the Slave Disk Recorder board Remove the short ribbon cable Ìconnected between the Master Disk Recorder board and the Slave Disk Recorder board It may be necessary to move boards around to accommodate the slot requirements for the Fibre Channel board and the new EDR boards If moving boards around requires removal of any internal cables Grass Valley Group recommends making a diagra...

Страница 35: ...Preparing the Profile System PDR 100 Fibre Channel Installation 35 Figure 10 Internal SCSI Cables Removal 9674 9 2 3 1 ...

Страница 36: ...l and 4 channel systems if you currently have an Ethernet 10 BaseT board you must remove that board To remove the old Master and if installed Slave Disk Recorder boards 1 Use the Torx tool with the T15 tip to remove the screws which secure each board to the rear panel see Figure 11 for an example 2 Use the extraction lever on the front of each board and the extraction ring at the back of each boar...

Страница 37: ... and 1 Use the Torx tool with the T15 tip to remove the board bracket retaining screw from the inside of the rear panel 2 Carefully but firmly grasp the board and lift it straight up and out of the chassis Note that you may have to remove an adjacent full size board in order to safety grasp the Ethernet 10 BaseT board Figure 12 Typical Removal of a Short Board 9674 18 ...

Страница 38: ...st you in installing boards Video Router to Motherboard Relationship The Video Router provides and controls video data to twelve connectors on the motherboard These video data connectors are aligned with the main motherboard connectors for slots J5 through J16 Since the Ref Gen board must occupy J16 to provide the necessary system clocks this discussion excludes J16 When choosing a slot for a boar...

Страница 39: ... Channel Analog Out 4 None J11 J12 J6 J7 Only J6 J7 J11 and J12 have 4 or more inputs If in J11 or J12 board must be able to get a shared input the 4th from an adjacent slot J10 or J13 Analog Composite Monitor Out 4 None J11 J12 J6 J7 Only J6 J7 J11 and J12 have 4 or more inputs If in J11 or J12 board must be able to get a shared input the 4th from an adjacent slot J10 or J13 Analog Composite I O ...

Страница 40: ...o Router The numbers in the blocks correspond to the order input connections are assigned at the Video Router connector The Outputs column identifies data output connections from the slots boards to the Video Router The numbers in the blocks correspond to the order output connections are assigned at the Video Router connector The shaded blocks in the diagram indicate Video Router connections share...

Страница 41: ...stallation 41 Table 4 Board location chart Slot Board Input Output J5 1 1 2 2 3 J6 6 2 5 4 3 1 2 1 J7 1 1 2 3 4 2 5 6 J8 2 1 1 2 3 4 J9 1 4 3 2 2 1 J10 1 1 2 2 3 4 J11 4 4 3 3 2 2 1 1 J12 1 1 2 2 3 4 3 4 J13 2 4 3 1 2 1 J14 1 1 2 2 3 J15 1 1 2 2 3 ...

Страница 42: ...red Video Router connections available Starting with the 1 block put an X in each block that corresponds to an input and output requirement for the board If the recommended slot is occupied or there are not enough input or output blocks available look at the alternative slots 4 If all input and output requirements for the board match the available ones for the slot write the board name in the Boar...

Страница 43: ...in slot J11 to slot J10 5 Move the Audio I O board in slot J12 to slot J11 6 Move the Audio I O board in slot J13 to slot J12 7 Now fill in the Board Location Chart a For the Serial I O in slot J7 which requires two inputs and two outputs Write Serial I O in Slot 7 Put check marks in the 1 and 2 Input blocks for J7 Put check marks in the 1 and 2 Output blocks for J7 b For the Audio I O boards in s...

Страница 44: ...9 Looking at your Board Location Chart reveals that slots J13 J14 and J15 meet requirements for all three boards 10 For the Slave EDR board Put Xs in the 1 and 2 Input blocks for J13 Put Xs in the 1 and 2 Output blocks for J13 Write Slave EDR in the Boards column for Slot J13 and install the board 11 For the Master EDR board Put Xs in the 1 and 2 Input blocks for J14 Put Xs in the 1 and 2 Output b...

Страница 45: ...1 2 1 J7 Serial Digital I O 1 3 1 3 2 3 3 4 2 3 5 6 J8 Analog Audio I O 2 1 1 2 3 4 J9 Analog Audio I O 1 4 3 2 2 1 J10 Serial Digital I O 1 3 1 3 2 3 2 3 3 4 J11 Analog Audio I O 4 4 3 3 2 2 1 1 J12 Analog Audio I O 1 1 2 2 3 4 3 4 J13 Fibre Channel 2 4 3 1 2 1 J14 Master Enhanced Disk Recorder 1 X 1 X 2 X 2 X 3 J15 Slave Enhanced Disk Recorder 1 X 1 X 2 X 2 X 3 ...

Страница 46: ...our Board Location Chart you see that slot J7 is occupied but that slot J6 is open and although it only has five Inputs the 6th Input can be the input shared with J5 which is open 3 On your Board Location Chart for the Mix Effects board Put Xs in the 1 5 Input blocks for J6 Put an X in the shared Input block for J5 Put Xs in the 1 and 2 Output blocks for J6 4 Write Mix Effects in the Board column ...

Страница 47: ... X 3 X 1 X 2 X 1 J7 Serial Digital I O 1 3 1 3 2 3 3 4 2 3 5 6 J8 Analog Audio I O 2 1 1 2 3 4 J9 Analog Audio I O 1 4 3 2 2 1 J10 Serial Digital I O 1 3 1 3 2 3 2 3 3 4 J11 Analog Audio I O 4 4 3 3 2 2 1 1 J12 Analog Audio I O 1 1 2 2 3 4 3 4 J13 Fibre Channel 2 4 3 1 2 1 J14 Master Enhanced Disk Recorder 1 X 1 X 2 X 2 X 3 J15 Slave Enhanced Disk Recorder 1 X 1 X 2 X 2 X 3 ...

Страница 48: ... J10 are the only video boards The audio clock cable connections are Channel 1 of the Serial I O board in slot J7 to Audio 1 PLAY on the Audio I O in slot J8 Channel 2 of the Serial I O board in slot J7 to Audio 2 PLAY on the Audio I O in slot J9 Channel 1 of the Serial I O board in slot J10 to Audio 3 RECORD on the Audio I O in slot J11 Channel 2 of the Serial I O board in slot J10 to Audio 4 REC...

Страница 49: ...DR 100 Fibre Channel Installation 49 Figure 13 Example of Audio Clock Cabling 9674 30 Serial I O Audio 1 Audio 2 Serial I O Audio 3 Audio 4 Ref Gen Ch 2 Record Play Ch 1 J17 J13 J16 J15 J14 J6 J7 J4 J3 J5 J12 J11 J9 J8 J10 ...

Страница 50: ...e 10 100 BaseT board the Slave and Master EDR boards and the Fibre Channel board Reinstalling board hold down brackets Reconnecting internal cables Installing the PCI Interconnect board Installing EMI compliance components if necessary Replacing the Profile covers Replacing the Profile chassis into the rack Connecting reconnecting external cables and power cord NOTE After board relocations the slo...

Страница 51: ...Installing the Fibre Channel Upgrade PDR 100 Fibre Channel Installation 51 Figure 14 Board Slot IDs Rear Panel 9674 19 J1 J17 J13 J16 J15 J14 J6 J7 J4 J3 J2 J5 J12 J11 J9 J8 J10 ...

Страница 52: ...PDR 100 Fibre Channel Installation 52 PDR 100 Fibre Channel Installation Figure 15 Slave EDR Master EDR and Fibre Channel Board Locations 9674 16 Master J14 Fibre Channel J15 Slave J13 ...

Страница 53: ...ard into the board area aligning it with the connectors in the motherboard at the bottom panel and the rear panel cutout for J3 3 Ensure that the board contacts are correctly aligned with the motherboard connectors and firmly press down on the board until it is fully seated Screw holes in the board bracket should align with the two bracket mounting screw holes one on the inside and one on the outs...

Страница 54: ...PDR 100 Fibre Channel Installation 54 PDR 100 Fibre Channel Installation Figure 16 Short Board Installation Example Top View 9674 11 ...

Страница 55: ... the bottom panel and the rear panel cutout for J13 3 Ensure that the board contacts are correctly aligned with the motherboard connectors and firmly press down on the board until it is fully seated Screw holes in the board bracket should align with the two bracket mounting screw holes one on the inside and one on the outside of the rear panel 4 Use the Torx tool with the T15 bit to secure the Sla...

Страница 56: ...PDR 100 Fibre Channel Installation 56 PDR 100 Fibre Channel Installation Figure 17 Distinguishing Between Master and Slave EDRs 9674 23 i960 Master EDR Slave EDR ...

Страница 57: ...Installing the EDR Boards PDR 100 Fibre Channel Installation 57 Figure 18 Installing a Full Size Board Example 9674 7 ...

Страница 58: ... area for slot J15 aligning it with the edge board connectors in the motherboard at the bottom panel and the rear panel cutout for J15 2 Ensure that the board contacts are correctly aligned with the motherboard connectors and firmly press down on the board until it is fully seated Screw holes in the board bracket should align with the two bracket mounting screw holes one on the inside and one on t...

Страница 59: ... Refer to Figure 19 and 1 Connect the cable labelled SCSI A Êin Figure 19 to the header connector on the Master EDR board 2 For a 4 channel PDR100 connect the cable labelled SCSI B Ëin Figure 19 to the header connector on the Slave EDR 3 From your diagram reconnect all other previously removed internal cables Figure 19 SCSI Cable Connections 9674 17 1 2 ...

Страница 60: ...and the bottom of the board identifies the connectors as J1 J2 and J3 J2 is further identified as MASTER To install the PCI board refer to Figure 21 and proceed as follows 1 Hold the PCI with the connectors pointing down and the connector identifications towards the rear of the Profile chassis 2 Align the PCI connectors so that J1 is over the Slave EDR header connector Master J2 over the Master ED...

Страница 61: ...ation 61 Figure 21 PCI Interconnect Board Installation 3 Attach the PCI board by gently but firmly pressing down until the PCI board is fully seated on all three boards 4 Tighten the screws which secure the EDR boards and the Fibre Channel board to the chassis 9674 10 ...

Страница 62: ... not installed at the Analog Composite Monitor board location To move a short board bracket extender refer to Figure 22 and proceed as follows 1 Use the Torx tool with the T15 bit and remove extender retaining screw Ê from the bracket 2 Move the extender to the desired location on the bracket 3 Ensure that the extender alignment nub is in the hole on the bracket and replace retaining screw Ë Figur...

Страница 63: ...retaining screw Ë Figure 23 Board Retainer Bracket installation To reinstall the full size board retainer bracket refer to Figure 23 and proceed as follows 1 Place bracket Ìover the boards 2 Align the full size boards to the correct bracket slots see insert in Figure 23 and carefully seat the bracket onto the boards 9674 14 4 2 1 3 ...

Страница 64: ...our PDR100 remains compliant with EMI standards with the Fibre Channel upgrade installed you must 1 Remove two cables behind the front panel and replace them with the cables included in this upgrade kit 2 Install a gasket inside the rear panel behind the power supply The following procedures explain how to perform these modifications To replace the cables The front panel cable assembly Figure 24 a...

Страница 65: ...nnel Installation 65 Figure 25 LED Cable Assembly Figure 26 shows removal of the front panel and bezel 1 Refer to Figure 26 and remove the PDR100 handles Êin Figure 26 and front panel metal plate Ëin Figure 26 to access the two cables on the bezel 9674 24 ...

Страница 66: ...PDR 100 Fibre Channel Installation 66 PDR 100 Fibre Channel Installation Figure 26 Removing the Front Panel and Bezel ...

Страница 67: ...nnel Installation 67 2 Refer to Figures 24 25 and 27 and replace the front panel and LED cable assemblies 3 Refer to Figure 26 and reinstall the front panel metal plate bezel and handles Figure 27 Installing the Front Panel and LED Cable Assemblies 9674 28 ...

Страница 68: ...oward the front of the chassis approximately 1 inch 3 Remove the protective strip from the adhesive on the EMI gasket 4 Carefully slip the gasket into the chassis between the power supply and the rear panel and attach it to the chassis just below the power cord connector cut out as shown at Ëin Figure 28 5 Slide the power supply back into its original position and secure it to the chassis with the...

Страница 69: ...ards The other set allows you to re identify slots as a result of any board movement which was necessary due to installation of the Fibre Channel kit Figure 29 shows the locations for the new stickers If you need additional or different stickers contact your Grass Valley Group representative Figure 29 Sticker Slot IDs for New Boards 9674 22 Fibre Channel EDR Master EDR Slave 10 100 Base T Ethernet...

Страница 70: ...ace and use the Torx tool with the T10 bit to replace the twelve cover screws eight on top and four from the side 2 Set disk drive cover Ëin place and use the Torx tool with the T10 and T15 tips to replace the cover with the screws previously removed NOTE Your PDR100 may have more disk drive cover screws than shown in Figure 30 Figure 30 Profile Cover Replacements 1 2 9674 12 ...

Страница 71: ...ely into the rack 3 Tighten the retaining screw to secure the Profile chassis in the rack Cable Connections 1 If you are using more than two Profile systems connect the 5 meter Fibre Channel cable from the Fibre Channel board connector on the rear panel to the Fibre Channel hub See the Fibre Channel Hub manual for instructions on how to install the Fibre Channel Hub Note that if connection to the ...

Страница 72: ...and recognized boards to see if the system recognizes the boards To check for board recognition 1 Open the Diagnostics window by selecting PDR Debug Tools PDR Diagnostics 2 On the left side of the window ensure that Fibrechannel I F Master EDR and Slave EDR appear at the slots in which you installed them see Figure 31 for an example 3 You must now configure the Fibre Channel board for use in your ...

Страница 73: ...he Ethernet Board for TCP IP Configuring the Fibre Channel Board Slot J1 Slot J2 Slot J3 Slot J4 Slot J5 Slot J6 Slot J7 Slot J8 Slot J9 Slot J10 Slot J11 Slot J12 Slot J13 Slot J14 Slot J15 Slot J16 Slot J17 Mother Bd Pentium CPU Quit Mother Board Rev 0 RS422 if installed Ref Gen 4 LTC Rev 0 Non EISA slot SMCA010 Slave EDR Rev 0 BUS4202 Serial Cmpnt I O Rev 2 Audio Fibrechannel I F Rev 0 Master E...

Страница 74: ...CMOS icon in the PDR Debug group 2 Reboot the Profile system and log in as administrator 3 Ensure that you are in the directory where the Profile software is installed usually c profile 4 Open the Control Panel and double click on the Network icon 5 In the list of adapters highlight the Intel Ether Express Adapter and click on the Remove Adapter button 6 Click on the Add Adapter button select Othe...

Страница 75: ... 2 You must fill in two fields in the TCP IP dialog box IP Network Address and Subnet Mask For the IP Network Address Grass Valley Group recommends the following numbering convention Note that each Profile must have a unique IP address For the first profile use 128 181 1 1 For the second profile use 128 181 1 2 For the third profile use 128 181 1 3 etc 3 For the Subnet mask use the same value on a...

Страница 76: ...ing your Fibre Channel network requires that you perform software setup tasks such as Setting the Fibre Channel hardware address Setting the TCP IP address for your Fibre Channel network See the Profile Family User Manual for information about how to perform the above tasks and how to use the Fibre Channel video network ...

Страница 77: ...pt appears in the GDB960 window select the All Tests button on the Master EDR board menu 5 Observe the messages which appear in the GDB960 window If any FAILED message appears the EDR Master board is bad and needs to be replaced 6 If no failures are noted at the end of the tests when READY re appears choose Done in the Master EDR board menu 7 Repeat Steps 3 through 6 for the Slave EDR board 8 Repe...

Страница 78: ...on 78 PDR 100 Fibre Channel Installation this may take between 10 and 15 minutes Once initiated you cannot cancel this diagnostics operation 10 Select Quit at the bottom of the Board Configuration panel to exit the Diagnostics window ...

Отзывы: