
72
KARRERA K-FRAME — Installation & Service Manual
Section 3 — Frames Installation
a choice between high line or low line operation, the user should consider
the advantages and disadvantages of each power sourcing scheme.
Video Processor Door Removal Clearance
CAUTION
The Video Processor front door must remain in place and closed during
normal system operation to maintain maximum cooling efficiency.
The K-Frame Video Processor door can be completely removed when
installed in a rack immediately below conventional flush mounted rack-ear
only equipment. If the K-Frame power supply is mounted directly above
the K-Frame chassis, the chassis door can be completely removed after
removing the power supply’s front screen. However, mounting a K-Frame
in a rack immediately below other equipment that extends forward from
the rack (for example, under another K-Frame chassis) may not provide
enough clearance to remove the K-Frame door.
If mounted below equipment that extends forward from the rack, allow at
least 24 mm (0.94 in.) of vertical clearance above the K-Frame to permit
door removal. A flush design 1 RU blank filler panel can be used for clear-
ance, if required.
Содержание KARRERA K-FRAME
Страница 12: ...12 KARRERA K FRAME Installation Service Manual Contents ...
Страница 30: ...30 KARRERA K FRAME Installation Service Manual Regulatory Notices ...
Страница 56: ...56 KARRERA K FRAME Installation Service Manual Section 2 Control Surface Installation ...
Страница 152: ...152 KARRERA K FRAME Installation Service Manual Section 5 Basic Configuration Figure 104 FBWF Manager ...
Страница 266: ...266 KARRERA K FRAME Installation Service Manual Appendix B Field Replaceable Units ...
Страница 278: ...278 KARRERA K FRAME Installation Service Manual Index ...