CE5000-UM-251-9370 2-9
2 PARTS NAMES and FUNCTIONS
(3) Insert the sheet support pipes into the sheet support pipe brackets. Use the lower holes for the pipe that
will be at the front of the cutting plotter, and the upper holes for the pipe that will be at the rear.
Remove the tape from the ends of the pipes to expose the adhesive, and then fit the rubber caps on
firmly.
Sheet support pipe
Rubber cap
Removable tape
(4) Mount the CE5000-120AP on the stand by inserting the positioning pins on the stand into the positioning
holes on the underside of the cutting plotter and then fasten with the four hexagonal bolts (M6).
Make sure that the casters with the stoppers are at the front.
Positioning pin
Hexagonal
socket bolt (M6)
Stand
CE5000AP
cutting plotter
Stoppers
Содержание CE5000 SERIES
Страница 1: ...CE5000 UM 251 22 9370 CE5000 Series SERVICE MANUAL MANUAL NO CE5000 UM 251 CUTTING PLOTTER...
Страница 8: ......
Страница 26: ......
Страница 36: ......
Страница 38: ......
Страница 82: ......
Страница 108: ......
Страница 112: ......
Страница 114: ...CE5000 UM 251 9370 10 2 10 PARTS LIST Outer Casing 1 2 3 4 5 8 6 7 9 10 13 11 12 14 15 16 18 17 19 20 21...