52
8.1 General Requirements
The Grant Spira Condensing Wood
Pellet boiler requires a 230 V ~50 Hz
electrical supply. The unit must be
connected to a mains power supply
via a fused spur that is protected by a
30mA RCD.
The boiler requires both a permanent
mains supply and a switched live
supply to control the boiler.
The fused spur of the power supply to
the boiler and controls must be fitted
with a 13A fuse.
A second fused spur (5A fuse) fed from
the first fused spur is included to supply
the heating system controls circulating
pump. Refer to Figure 8-9 and 8-10.
For the UK, the electrical installation
must be carried out by a competent
installer in accordance with the
requirements of the Electricity at work
Regulations 1989 and BS 7671:2008
– IET Wiring Regulations 17th Edition
(including all amendments).
All the wiring and supplementary earth
bonding external to the boiler must
be in accordance with the current IET
wiring regulations.
Any heating system controls, e.g.
room thermostat , frost thermostat,
etc. connected to this boiler must be
suitable for use on mains voltage.
8.2 Hopper Electrical
Connections
All Grant Spira boiler pellet hoppers are
fitted with two in-line 5A fuses. These
are located inside the electrical wiring
enclosure in the back of the pellet
hoppers.
8.2.1 Single Boiler Hopper
(with a single auger) – in either a left
hand or right hand version as required,
to supply a single boiler.
This hopper is fitted with three pre-wired
flying leads with factory-fitted plugs:
• 4-way plug – for connection of the
permanent live, earth and neutral
and also the switched live from the
heating controls system.
• 5-way plug – to connect the hopper
to the boiler.
• 6-way plug – to connect either a
bulk pellet store auger or Grant
SpiraVac vacuum system to the
hopper and boiler.
Refer to Figure 8-7 for hopper wiring
diagram.
8.2.2 Double Boiler Hopper
(with two augers) – to supply two boilers
in a ‘double boiler’ installation.
This hopper is fitted with four pre-wired
flying leads with factory-fitted plugs:
• 4-way plug – for connection of the
permanent live, earth and neutral
and also the switched live from the
heating controls system.
• Two 5-way plugs – one to connect
to each of the two boilers.
• 6-way plug – to connect either a
bulk pellet store auger or Grant
SpiraVac vacuum system to the
hopper and boiler.
Refer to Figure 8-8 for double hopper
wiring diagram.
8.2.3 For Installations with a Bulk
Pellet Store only
Both single boiler and double boiler
hoppers are supplied with the 6-way
plug parked inside the wiring enclosure.
See Figure 8-1.
If a bulk pellet store is to be used:
• Remove the wiring centre cover
from the rear of the hopper.
• Unclip the 6-way plug from
diaphragm switch bracket.
• Pass the 6-way plug lead through
the grommet just below the wiring
centre cover.
• Set the toggle switch on the
diaphragm switch bracket to ‘BULK
STORE’. See Figure 8-1.
• Replace the wiring centre cover and
fasten in place using the screws
previously removed.
• Connect the 6-way plug to the
corresponding 6-way connector on
the pre-wired flying lead fitted to
either the bulk pellet auger or Grant
SpiraVac system.
• If using the Grant SpiraVac
system, refer to the installation
instructions supplied with the
system for further details on its
installation and operation.
8.2.4 For Installations using the
Pellet Hopper only
The pellet hopper is supplied with the
toggle switch set to ‘HOPPER ONLY’.
When used without a bulk pellet store,
the pellet hopper has the facility for
the connection of a 230V ‘low pellet’
indicator lamp (not supplied). This will
indicate to the householder that the
pellets in the hopper have reached the
minimum level and the hopper needs to
be topped up.
The indicator lamp should be
positioned so it can be easily viewed by
the householder. See either Figure 8-7
or 8-8, as applicable, for the connection
details.
If a bulk store is used, with either the
Grant SpiraVac system or a Grant bulk
auger, a ‘low pellet’ indicator lamp
cannot
be fitted to the pellet hopper.
8 Electrical
Figure 8-1:
Hopper selector switch and
6-way plug
Содержание Spira 5-18
Страница 19: ...19 This page is intentionally left blank...
Страница 95: ...95 13 Spare Parts 13 1 Boiler Figure 13 1 Boiler components exploded view...
Страница 106: ...106 Notes...
Страница 107: ...107 This page is intentionally left blank...