10 Emptying the Ash Pan
It is essential that the ash pan (located inside the boiler
combustion chamber) is periodically emptied.
This simple task must be carried out by the user at MONTHLY
intervals for the FIRST THREE MONTHS after the boiler is
installed.
After that the ash pan should be emptied regularly, on at least
a MONTHLY basis, or as indicated by the amount of ash found
during the first three months.
NOTE
The amount of ash produced varies between the different
pellet brands and this will affect the frequency of cleaning and
maintenance required.
To remove and empty the ash pan you will need the following
items (supplied with the boiler):
•
The removable door handle – to open the combustion
chamber door. Refer to Figure 10-1.
•
The ash pan carrying handles – to remove and carry the ash
pan when hot. Refer to Figure 10-2.
To remove and empty the ash, follow the procedure below:
Step 1
Set the burner STANDBY/ON switch to ‘STANDBY’.
Step 2
If the boiler is running at the time, wait for it to complete the burner
shut-down sequence, i.e. until the burner control panel display
screen reads ‘WAIT PELLET THERMOSTAT’.
WARNING
After the burner has been switched off (either manually
using the burner ON/STANDBY switch on the control panel,
automatically by the boiler temperature control, or the
heating system controls) the burner needs to burn-down the
remaining pellets in the brazier.
Do not AT ANY TIME open the front combustion chamber
access door until the burner display reads “WAIT BOILER
THERMOSTAT”
Step 3
Allow the burner to cool down, for a period of at least 30 minutes.
Step 4
Disconnect the pellet delivery hose from the pellet feed tube on
the burner. Refer to Figure 10-3.
Step 5
Fit the removable door handle into the slot in the door catch. Refer
to Figure 10-4.
14
Figure 10-1:
Removable door handle
Figure 10-2:
Carrying handles
Figure 10-3:
Disconnect pellet hose from burner
Figure 10-4:
Fitting the removable door handle
Содержание Spira 5-18
Страница 19: ...19 This page is intentionally left blank...
Страница 95: ...95 13 Spare Parts 13 1 Boiler Figure 13 1 Boiler components exploded view...
Страница 106: ...106 Notes...
Страница 107: ...107 This page is intentionally left blank...