background image

COMET 145 – INSTALLATION/OPERATION MANUAL 

 

5IM-OB-COM0-00

 

 

 

Mar/11

 

9

7.0 BURNER 

SPECIFICATIONS 

 

Model ID 

  Burner 

Input 

Nozzle 

Pump 

(psi) 

Air

 

Setting

 

Turbulator 

Output

 

USGPH

 

L/h

 

Btu/h

 

kW

 

BCF-E2-0125-10(15)

 

CE3-1 

Riello 40 F3

 

0.61 2.31 

0.50 

80B 

150

 

2.70 0.5 74,000 

22 

CE3-2 0.73 

2.76 

0.60 

60W 3.50 

1.5 

88,000 

26 

CE3-3 0.80 

3.03 

0.65 

60W 3.70 

2.0 

96,000 

28 

CE3-4 0.92 

3.48 

0.75 

60W 4.20 

3.0 

111,000 

33 

CE3-5 1.04 

3.94 

0.85 

60W 5.00 

3.0 

125,000 

37 

BCF-E4-0145-10(15)

 

CE5-1 

Riello 40 F5

 

1.04 3.94 

0.85 

60W 

150

 

3.20 2.0 

125,000 

37 

CE5-2 1.22 

4.62 

1.00 

60W 3.40 

2.5 

146,000 

43 

BCF-B3-0095-10(15)

 

CB3-1 

Beckett AFII – 85 -90*

 

0.67 2.54 

0.50 

70B 180

 

4.00 pin 

3 82,000 

24 

CB3-2 0.77 

2.91 

0.65 

60A 

140

 

4.75 pin 

5 94,000 

28 

BCF-B2-0140-10(15)

 

CB5-1 

Beckett AFII – 150 -90**

 

0.89 3.37 

0.75 

60A 

140

 

4.75 pin 

107,000 

31 

CB5-2 1.00 

3.79 

0.85 

60B 7.00 

pin 

118,000 

35 

CB5-3 1.18 

4.47 

1.00 

60B 7.50 

pin 

140,000 

41 

Direct Vent 

BCF-V2-0110-10(15)

 

CV3-1 

Riello 40 BF3

 

0.61 3.48 

0.50 

80B 

150

 

4.10 1.00 74,000 

22 

CV3-2 0.73 

2.76 

0.60 

60W 5.00 

1.50 

88,000 

26 

CV3-3 0.80 

3.03 

0.65 

60W 5.60 

2.00 

96,000 

28 

BCF-V4-0145-10(15)

 

CV5-1 

Riello 40 BF5

 

0.92 3.48 

0.75 

60W 

150

 

4.00 1.50 

111,000 

33 

CV5-2 1.04 

3.94 

0.85 

60W 4.50 

2.00 

125,000 

37 

CV5-3 1.22 

4.62 

1.00 

60W 5.50 

2.50 

146,000 

43 

BCF-D8-0140-10(15)

 

CB1-1 

Beckett AFII – 100***

 

0.77 2.91 

0.65 

60B 

140

 

6.60 pin 

0 90,000 

26 

CB1-2 0.89 

3.37 

0.75 

60B 3.30 

pin 

107,000 

31 

CB1-3 1.00 

3.79 

0.85 

60B 5.80 

pin 

118,000 

35 

CB1-4 1.18 

3.94 

1.00 

60B 9.00 

pin 

140,000 

41 

 

*  Beckett AFII-85 – Air Tube HLX90HD (PA701) 
**  Beckett AFII-150 – Air Tube HLX90HC (PA601) 
*** Beckett AFII-100 – Air Tube HLX90HB (PA901) post purge preset to 2 min. 

 

The information provided by the manufacturer of this furnace supersedes any information 
provided by any other party including the manufacturer of the burner. 

 
 
 
 
 
 
 
 
 

Содержание Comet 145

Страница 1: ...THAT MAY DIFFER FROM THIS MANUAL Please read this complete manual before beginning installation These instructions must be kept with the boiler for future reference CERTIFIED TO CAN CSA Std B140 0 St...

Страница 2: ...0 Installation 4 2 1 Important 4 2 2 Caution 4 2 3 General Instructions 4 2 4 Placement Venting 4 2 5 Boiler Configuration 5 2 6 Assemble Boiler 5 2 7 Domestic Hot Water 6 2 8 Assemble Install Burner...

Страница 3: ...lation Figure 5 Cleaning Figure 6 Cabinet Assembly Figure 7 Dimensions Figure 8 Exploded Parts Table 1 Parts List Keep this manual in a safe place for future reference Follow manual carefully for the...

Страница 4: ...DO NOT ATTEMPT TO START BURNER WHEN EXCESS OIL HAS ACCUMULATED WHEN UNIT IS FULL OF VAPOUR OR COMBUSTION ZONE IS VERY HOT NEVER BURN GARBAGE OR PAPER IN THE UNIT AND NEVER STORE COMBUSTIBLE MATERIAL A...

Страница 5: ...ION INSTALLATION MUST COMPLY WITH REGULATIONS OF AUTHORITIES HAVING JURISDICTION DO NOT START THE BURNER UNTIL ALL FITTINGS COVERS AND DOORS ARE IN PLACE DO NOT TAMPER WITH THE BOILER OR CONTROLS 2 3...

Страница 6: ...e section 2 8 ASSEMBLE INSTALL BURNER AQUASTAT Honeywell L8124L1029 and White Rogers 8B43A 601 or certified equivalent For remote bulb use Honeywell L8151A1052 The Triple Aquastat can be located on th...

Страница 7: ...o correspond with boiler settings table shown on operating decal or section 7 0 BURNER SPECIFICATIONS INSTALL NOZZLE Install selected nozzle and make sure it is tight in the nozzle adapter ELECTRODES...

Страница 8: ...nk gauge protectors and outlet protectors are available at your local dealer ONE PIPE SYSTEM Where the tank is above the burner and when the oil flows by gravity to the oil pump a single stage fuel un...

Страница 9: ...NER Make sure power and fuel are off CLEAN TUBES Clean the tubes carefully with a 2 fiber bristle brush DO NOT DAMAGE TARGET WALL VACUUM Vacuum out lower burner chamber REPLACE BURNER Check insertion...

Страница 10: ...31 CB5 2 1 00 3 79 0 85 60B 7 00 pin 0 118 000 35 CB5 3 1 18 4 47 1 00 60B 7 50 pin 0 140 000 41 Direct Vent BCF V2 0110 10 15 CV3 1 Riello 40 BF3 0 61 3 48 0 50 80B 150 4 10 1 00 74 000 22 CV3 2 0 73...

Страница 11: ...ar as possible 5 Insert the threaded tube end into the pierced hole of the flue vent pipe 6 Install the securing nut on the safety switch tube which protrudes into the flue vent pipe Tighten the nut s...

Страница 12: ...ue temperature is 575 F DRAFT non Direct Vent only Breech Pressure 0 04 wc CONTROLS AQUASTAT Honeywell L8124L1029 L8124G1020 White Rodgers 8B43A 601 Erie Boss 2400 Series Optional Remote Honeywell L81...

Страница 13: ...8 Liters 73 89 SPECIFICATIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE FOR MOST RECENT UPDATES PLEASE VISIT www GranbyIndustries com The following form MUST be completed for the warranty to be valid Insta...

Страница 14: ......

Страница 15: ......

Страница 16: ......

Страница 17: ......

Страница 18: ......

Страница 19: ......

Страница 20: ......

Страница 21: ......

Страница 22: ...00 COMET 145 10B Pressure Vessel Assembly BCF CB 0110 00 COMET 145 11A Cabinet Top BCA CB 0110 00 COMET 145 11B Cabinet Top BCF CB 0010 00 COMET 145 12 Boiler Jacket 3CC 00 WALL 03 COMET 145 13 Targe...

Отзывы: