background image

COMET 145 – INSTALLATION/OPERATION MANUAL 

 

5IM-OB-COM0-00

 

 

 

Mar/11

 

6

VENT PIPE 5” 

Keep short with minimum of fittings.  For chimney systems allow 1/4” 
per foot rise to assist gas flow.  See B139 Code and section 

2.4  

PLACEMENT & VENTING

.  Must not pass through ceiling. 

 

PIPING 

1 1/4” pipe for supply and return unless otherwise specified.  Select L 
or R as required.  See Figure - 4. 

 

2.7  DOMESTIC HOT WATER COIL 

 

Use a K25m coil only.  For best performance always connect cold water supply to RHS fitting 
on coil. 

 

ACTUAL FLOW & TEMPERATURE RATES MAY VARY FROM COIL SPECIFICATION

 

 

2.8  ASSEMBLE & INSTALL BURNER 

 

ASSEMBLE 

Follow assembly and mounting instructions supplied by the burner 
manufacturer. 

 

END CONE 

See burner insertion settings in section 

7.0 BURNER 

SPECIFICATIONS

 or Figure – 1. 

 

SELECT NOZZLE 

Select oil input, nozzle required and burner configuration to correspond 
with boiler settings table shown on operating decal or section 

7.0 

BURNER SPECIFICATIONS

 

INSTALL NOZZLE 

Install selected nozzle and make sure it is tight in the nozzle adapter. 

 

ELECTRODES 

See burner manufacturer’s instructions. 

 

INSERTION 

See operating decal or Figure – 1. 

 

MOUNT BURNER 

Mount the burner and gasket on the boiler, inserting the burner head 
through the opening in the front of the boiler.  Tighten top nut first to 
ensure burner tips slightly towards chamber. 

 

WIRING 

See Figure – 3 or wiring decal. 

 

2.9  SET BURNER FOR EFFICIENT OPERATION 

 

END CONE 

See settings in section 

7.0 BURNER SPECIFICATIONS

 

BURNER AIR 

See settings in section 

7.0 BURNER SPECIFICATIONS

 

PUMP PRESSURE 

See settings in section 

7.0 BURNER SPECIFICATIONS

 

SAMPLING HOLE 

In vent pipe between boiler breech and draft control punch or drill a 
1/4” diameter hole.  Not applicable for Direct Vent. 

 

DRAFT 0.04” WC 

Using an accurate draft meter; adjust the draft control to obtain 0.04” 
wc of draft at the breech sampling hole.  Not applicable for Direct Vent. 

 

Содержание Comet 145

Страница 1: ...THAT MAY DIFFER FROM THIS MANUAL Please read this complete manual before beginning installation These instructions must be kept with the boiler for future reference CERTIFIED TO CAN CSA Std B140 0 St...

Страница 2: ...0 Installation 4 2 1 Important 4 2 2 Caution 4 2 3 General Instructions 4 2 4 Placement Venting 4 2 5 Boiler Configuration 5 2 6 Assemble Boiler 5 2 7 Domestic Hot Water 6 2 8 Assemble Install Burner...

Страница 3: ...lation Figure 5 Cleaning Figure 6 Cabinet Assembly Figure 7 Dimensions Figure 8 Exploded Parts Table 1 Parts List Keep this manual in a safe place for future reference Follow manual carefully for the...

Страница 4: ...DO NOT ATTEMPT TO START BURNER WHEN EXCESS OIL HAS ACCUMULATED WHEN UNIT IS FULL OF VAPOUR OR COMBUSTION ZONE IS VERY HOT NEVER BURN GARBAGE OR PAPER IN THE UNIT AND NEVER STORE COMBUSTIBLE MATERIAL A...

Страница 5: ...ION INSTALLATION MUST COMPLY WITH REGULATIONS OF AUTHORITIES HAVING JURISDICTION DO NOT START THE BURNER UNTIL ALL FITTINGS COVERS AND DOORS ARE IN PLACE DO NOT TAMPER WITH THE BOILER OR CONTROLS 2 3...

Страница 6: ...e section 2 8 ASSEMBLE INSTALL BURNER AQUASTAT Honeywell L8124L1029 and White Rogers 8B43A 601 or certified equivalent For remote bulb use Honeywell L8151A1052 The Triple Aquastat can be located on th...

Страница 7: ...o correspond with boiler settings table shown on operating decal or section 7 0 BURNER SPECIFICATIONS INSTALL NOZZLE Install selected nozzle and make sure it is tight in the nozzle adapter ELECTRODES...

Страница 8: ...nk gauge protectors and outlet protectors are available at your local dealer ONE PIPE SYSTEM Where the tank is above the burner and when the oil flows by gravity to the oil pump a single stage fuel un...

Страница 9: ...NER Make sure power and fuel are off CLEAN TUBES Clean the tubes carefully with a 2 fiber bristle brush DO NOT DAMAGE TARGET WALL VACUUM Vacuum out lower burner chamber REPLACE BURNER Check insertion...

Страница 10: ...31 CB5 2 1 00 3 79 0 85 60B 7 00 pin 0 118 000 35 CB5 3 1 18 4 47 1 00 60B 7 50 pin 0 140 000 41 Direct Vent BCF V2 0110 10 15 CV3 1 Riello 40 BF3 0 61 3 48 0 50 80B 150 4 10 1 00 74 000 22 CV3 2 0 73...

Страница 11: ...ar as possible 5 Insert the threaded tube end into the pierced hole of the flue vent pipe 6 Install the securing nut on the safety switch tube which protrudes into the flue vent pipe Tighten the nut s...

Страница 12: ...ue temperature is 575 F DRAFT non Direct Vent only Breech Pressure 0 04 wc CONTROLS AQUASTAT Honeywell L8124L1029 L8124G1020 White Rodgers 8B43A 601 Erie Boss 2400 Series Optional Remote Honeywell L81...

Страница 13: ...8 Liters 73 89 SPECIFICATIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE FOR MOST RECENT UPDATES PLEASE VISIT www GranbyIndustries com The following form MUST be completed for the warranty to be valid Insta...

Страница 14: ......

Страница 15: ......

Страница 16: ......

Страница 17: ......

Страница 18: ......

Страница 19: ......

Страница 20: ......

Страница 21: ......

Страница 22: ...00 COMET 145 10B Pressure Vessel Assembly BCF CB 0110 00 COMET 145 11A Cabinet Top BCA CB 0110 00 COMET 145 11B Cabinet Top BCF CB 0010 00 COMET 145 12 Boiler Jacket 3CC 00 WALL 03 COMET 145 13 Targe...

Отзывы: