background image

COMET 145 – INSTALLATION/OPERATION MANUAL 

 

5IM-OB-COM0-00

 

 

 

Mar/11

 

8

UPPER FRONT 

Carefully insert Upper Front around Coil and secure with screws. 

 

LOWER FRONT 

Place split Lower Front Panel around view port, burner pipe and return 
and screw as shown. 

 

BREECH 

Secure Breech Cover with screws using #8 Tek screws provided (2 per 
side). 

 

6.0 CLEANING 

INSTRUCTIONS

    

See Figure – 5 

 

POWER OFF 

Turn off main power switch. 

 

FUEL OFF 

Shut off manual fuel supply valve. 

 

REMOVE CABINET 

Remove smoke/vent pipe from the boiler breeching collar. 

COVER

 

 

REMOVE FRONT 

Remove breeching nuts, carefully loosen boiler breeching and lift off. 

BREECH

 

 

REMOVE GAS 

Remove the flue gas baffles from the boiler tubes and clean them  

BAFFLES

  

using a wire brush. 

 

REMOVE BURNER 

Make sure power and fuel are off. 

 

CLEAN TUBES 

Clean the tubes carefully with a 2” fiber bristle brush.  DO NOT 
DAMAGE TARGET WALL. 

 

VACUUM 

Vacuum out lower burner chamber. 

 

REPLACE BURNER 

Check insertion is as specified.  See Figure – 1. 

 

REPLACE BAFFLES 

Replace flue gas baffles in tubes. 

 

REPLACE BREECH 

Replace the boiler breeching and reseal against gaskets.  New 
gaskets can be obtained from your dealer.  Attach with high 
temperature silicone sealant.  Secure with brass nuts and washers. 

 

PANEL & PIPE 

Reinstall cabinet

 

panel and reinstall smoke/vent pipe.  Secure with 

sheet metal screws. 

 

CHECK 

Check installation before restoring power and fuel. 

 

CHECK BURNER 

Smoke and CO

2

 test.  Replace nozzle if required.  Set burner for 

efficient operation. 

 

REAR COVER 

Do not remove rear cover for cleaning, as it is silicone sealed.  If the 
cover is replaced reseal with silicone. 

 

WIRE BRUSH

 

Use a wire brush to clean the inside of the vent connector pipe. 

 
 
 

Содержание Comet 145

Страница 1: ...THAT MAY DIFFER FROM THIS MANUAL Please read this complete manual before beginning installation These instructions must be kept with the boiler for future reference CERTIFIED TO CAN CSA Std B140 0 St...

Страница 2: ...0 Installation 4 2 1 Important 4 2 2 Caution 4 2 3 General Instructions 4 2 4 Placement Venting 4 2 5 Boiler Configuration 5 2 6 Assemble Boiler 5 2 7 Domestic Hot Water 6 2 8 Assemble Install Burner...

Страница 3: ...lation Figure 5 Cleaning Figure 6 Cabinet Assembly Figure 7 Dimensions Figure 8 Exploded Parts Table 1 Parts List Keep this manual in a safe place for future reference Follow manual carefully for the...

Страница 4: ...DO NOT ATTEMPT TO START BURNER WHEN EXCESS OIL HAS ACCUMULATED WHEN UNIT IS FULL OF VAPOUR OR COMBUSTION ZONE IS VERY HOT NEVER BURN GARBAGE OR PAPER IN THE UNIT AND NEVER STORE COMBUSTIBLE MATERIAL A...

Страница 5: ...ION INSTALLATION MUST COMPLY WITH REGULATIONS OF AUTHORITIES HAVING JURISDICTION DO NOT START THE BURNER UNTIL ALL FITTINGS COVERS AND DOORS ARE IN PLACE DO NOT TAMPER WITH THE BOILER OR CONTROLS 2 3...

Страница 6: ...e section 2 8 ASSEMBLE INSTALL BURNER AQUASTAT Honeywell L8124L1029 and White Rogers 8B43A 601 or certified equivalent For remote bulb use Honeywell L8151A1052 The Triple Aquastat can be located on th...

Страница 7: ...o correspond with boiler settings table shown on operating decal or section 7 0 BURNER SPECIFICATIONS INSTALL NOZZLE Install selected nozzle and make sure it is tight in the nozzle adapter ELECTRODES...

Страница 8: ...nk gauge protectors and outlet protectors are available at your local dealer ONE PIPE SYSTEM Where the tank is above the burner and when the oil flows by gravity to the oil pump a single stage fuel un...

Страница 9: ...NER Make sure power and fuel are off CLEAN TUBES Clean the tubes carefully with a 2 fiber bristle brush DO NOT DAMAGE TARGET WALL VACUUM Vacuum out lower burner chamber REPLACE BURNER Check insertion...

Страница 10: ...31 CB5 2 1 00 3 79 0 85 60B 7 00 pin 0 118 000 35 CB5 3 1 18 4 47 1 00 60B 7 50 pin 0 140 000 41 Direct Vent BCF V2 0110 10 15 CV3 1 Riello 40 BF3 0 61 3 48 0 50 80B 150 4 10 1 00 74 000 22 CV3 2 0 73...

Страница 11: ...ar as possible 5 Insert the threaded tube end into the pierced hole of the flue vent pipe 6 Install the securing nut on the safety switch tube which protrudes into the flue vent pipe Tighten the nut s...

Страница 12: ...ue temperature is 575 F DRAFT non Direct Vent only Breech Pressure 0 04 wc CONTROLS AQUASTAT Honeywell L8124L1029 L8124G1020 White Rodgers 8B43A 601 Erie Boss 2400 Series Optional Remote Honeywell L81...

Страница 13: ...8 Liters 73 89 SPECIFICATIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE FOR MOST RECENT UPDATES PLEASE VISIT www GranbyIndustries com The following form MUST be completed for the warranty to be valid Insta...

Страница 14: ......

Страница 15: ......

Страница 16: ......

Страница 17: ......

Страница 18: ......

Страница 19: ......

Страница 20: ......

Страница 21: ......

Страница 22: ...00 COMET 145 10B Pressure Vessel Assembly BCF CB 0110 00 COMET 145 11A Cabinet Top BCA CB 0110 00 COMET 145 11B Cabinet Top BCF CB 0010 00 COMET 145 12 Boiler Jacket 3CC 00 WALL 03 COMET 145 13 Targe...

Отзывы: