
32
12.1 CLEANING THE BOILER
Section cleaning should only be performed by a service technician and must only be performed
when the boiler is out of service. The following steps should be followed:
•
Remove the 2 front panels by sliding it upwards to release and then pull to remove.
•
Open the front swing door by removing the four bolts; this will expose the chamber area as
well as the second and third passes.
(A)
•
Remove the stainless steel baffles. With a cleaning brush clean the boiler section, second
and third passes
. (B)
•
Remove insulation and the smoke hood cleaning access door from the rear section.
Remove any soot that may have collected in the smoke hood
. (C)
Baffles
cleaning
C access
door
A B C
•
Replace insulation on the rear section and smoke hood.
•
Replace swing door and tighten bolts.
•
Refit the front casing.
SPECIFIC TO INSPECTION AND SERVICE OF GAS2FIRED BOILERS
•
The vent system must be inspected annually.
•
If a low water cut5off is installed in the system, it must be inspected annually.
•
The burner flame in operation must be checked regularly. It should be mostly
blue with some yellow tipping permitted.
•
Check to make sure that the flow of combustion air to the burner is not
obstructed.
•
Verify proper operation of the boiler after servicing
Содержание B*G-3
Страница 26: ...25 9 2 GAS2FIRED BOILER LIGHTING INSTRUCTIONS...
Страница 28: ...27 Carlin Gas Burner 10 2 Boiler Info...
Страница 35: ...34 13 0 EXPLODED PARTS VIEW Exploded Parts View...