Granby B*G-3 Скачать руководство пользователя страница 14

13 

National electrical code ANSI/NFPA 70 and/or the Canadian electrical code Part 1, 

CSA 22.1, electrical code as applicable. 

 

Label  all  wires  prior  to  disconnection  when  servicing  controls.  Wiring  errors  can 

cause improper and dangerous operation. 

 

The connections must be made in a manner to insure that there is no crossing of the neutral 
with the phase, a proper ground shall be provided   and all three wires shall be connected to 
the operating control. 

 

Typical line voltage wiring for oil or gas burner with Honeywell L7248 boiler 

control and one heating zone. 

 

 

    Note: 

  For Canadian application, see page 21 for proper wiring with a Block Vent Shut-Off 

- BVSO safety device. 

 

With the Carlin EZ Gas burner, the Red/White lead on the burner relay must 

be connected with L1 on the boiler control, the black lead to B1 and the 

white lead to B2 on the boiler control. 

 

With the Riello  Gas burner, B1 must be connected to L on the burner 

control and B2 with N on the burner c

ontrol.

 

Содержание B*G-3

Страница 1: ...UNITS PLEASE REVIEW THIS MANUAL CAREFULLY IF YOUR BOILER IS NATURAL GAS FIRED OR PROPANE GAS FIRED Please read the manual in its entirety before beginning installation This manual must be kept with t...

Страница 2: ...injury or death Do not store or use gasoline or other flammable vapors or liquid in the vicinity of this or any other appliance WHAT TO DO IF YOU SMELL GAS o Do not try to light the appliance o Do no...

Страница 3: ...17 8 0 ACCESSORY INSTALLATION 21 9 0 BURNER INSTALLATION SETTING 22 9 1 GAS FIRED BOILERS 23 9 2 GAS FIRED BOILERS LIGHTING INSTRUCTIONS 25 10 0 TECHNICAL INFORMATION 26 10 1 GAS FIRED BOILERS 26 10 2...

Страница 4: ...F OR DISCONNECT THE POWER SUPPLY TO THE CIRCULATOR INSTEAD SHUT OFF THE GAS SUPPLY AT A LOCATION EXTERNAL TO THE APPLIANCE DO NOT USE THIS BOILER IF ANY PART HAS BEEN UNDER WATER IMMEDIATELY CALL A QU...

Страница 5: ...l fire codes for required clearances Connections to chimney must be made with the proper gauge thickness and diameter of fluepipe as required by CSAB149 1 NFPA 54 whichever is applicable CLEARANCE min...

Страница 6: ...1 PLACEMENT LEVELING OF THE UNIT The boiler should be located on firm foundation in an easily accessible area that meets the previously discussed clearances and air requirements In situations where t...

Страница 7: ...will be used to level the boiler Screw the 4 mm jacket affixing screw to the frame rail from the top down Both the bolt and affixing screw will be located on the same end of the frame rail The frame r...

Страница 8: ...ND BACK PANEL ATTACHMENT Affix panel mounting nuts to the rear of the tie rods Mount the side panels by placing the panel over the frame rail so that the hole in the bottom lip of the panel fits direc...

Страница 9: ...tom of the well STEP 7 TOP AND FRONT PANEL ATTACHMENT Affix the top panel by placing the holes located on the underside of the panel over the jacket affixing pins Press down on the top panel and it wi...

Страница 10: ...d downward to within 6 of the floor or to a height to meet existing code An expansion tank circulating pump and automatic air eliminators must be part of the system The relief valve backflow preventer...

Страница 11: ...10 Figure 1 A typical installation with no domestic hot water and no by pass loop installed Figure 2 A typical installation with no domestic hot water and with a by pass loop installed...

Страница 12: ...nstallation with domestic hot water supplied by an indirect heater and with no by pass loop installed Figure 4 A typical installation with domestic hot water supplied by an indirect heater and with a...

Страница 13: ...d to refrigerated air circulation must be equipped with flow control valves or other automatic means to prevent gravity circulation of the boiler water during the cooling cycle 5 0 ELECTRICAL WIRING A...

Страница 14: ...vided and all three wires shall be connected to the operating control Typical line voltage wiring for oil or gas burner with Honeywell L7248 boiler control and one heating zone Note For Canadian appli...

Страница 15: ...obstructions Never connect the boiler to a chimney or liner serving an open fireplace A 6 diameter flue pipe must be used for connection of the boiler flue outlet to the chimney for the entire length...

Страница 16: ...enting system is likely to be too large for proper venting of the appliances connected to it At the time of removal of the existing boiler the following steps shall be followed with EACH appliance rem...

Страница 17: ...tional fuel gas code ANSI Z223 1 NFPA 54 and or the Natural gas and propane installation code CAN CSA B149 1 When resizing any portion of the common venting system the common venting system should be...

Страница 18: ...t be sloping upwards not less than inch per foot from the boiler to the chimney connector 7 0 FUEL SYSTEM COMBUSTION VENTILATION OPENINGS Install openings and ductwork to the boiler room providing fre...

Страница 19: ...the authorities having jurisdiction Do not hold gas valve with a pipe wrench Use crescent wrench or other smooth jawed device Do not over5tighten Failure to comply with above could result in severe pe...

Страница 20: ...combination gas valve to gas pressures in excess of 14 W C The valve has a safety mechanism that interrupt the flow of gas over 14 W C In any event higher pressure could damage the valve seat resultin...

Страница 21: ...eration Enough combustion air should be provided to the gas5fired boiler in accordance with the section Air for combustion and ventilation of the National Fuel Gas Code ANSI Z223 1 NFPA 54 or clause 8...

Страница 22: ...s burner control On gas fired Boilers the BVSO acts as a spill switch on the outlet of the double acting draft regulator NEVER reset the switch unless the cause of the blockage has been corrected Ins...

Страница 23: ...m has cooled the blocked vent switch can manually be reset 5 This procedure should be tested a second time 6 After testing the blocked vent switch the chimney should be cleared of obstruction and the...

Страница 24: ...pecific size of boiler with a specific burner RIELLO GAS BURNERS o In the Section Setting the burner disregard the table and use the initial adjustments detailed for the appropriate boiler with Riello...

Страница 25: ...EM MUST BE TESTED THE METHOD OF TESTING IS AS FOLLOWS Place the boiler in operation by raising the thermostat and observe a normal ignition of the burner Lower the thermostat This should shut off the...

Страница 26: ...25 9 2 GAS2FIRED BOILER LIGHTING INSTRUCTIONS...

Страница 27: ...26 10 0 TECHNICAL INFORMATION Honeywell control L7248 high limit only cool start application 10 1 Gas Fired Boilers Riello Gas Burner...

Страница 28: ...27 Carlin Gas Burner 10 2 Boiler Info...

Страница 29: ...AND OPERATION 11 1 START UP PROCEDURE Prior to start up make sure the service switch is in the OFF position Check all fittings and wiring Insure that the boiler and the entire heating system are comp...

Страница 30: ...and or DOWN buttons to move the set point to the desired value Note After 60 seconds without any button inputs the control will automatically return to the RUN mode and lock the setting Error Codes Wh...

Страница 31: ...pump If pump is running check for trapped air or closed zone valves TESTING SAFETY AND CONTROL DEVICES In the event the boiler is equipped with a low water cut off the cut off should be tested in acco...

Страница 32: ...this is not sufficient consider cutting or removing some flue baffles in the furnace BE AWARE THAT REMOVING BAFFLES REDUCES THE UNIT EFFICIENCY AND A MODIFIED UNIT IS NO LONGER ENERGY STAR APPROVED HO...

Страница 33: ...e insulation and the smoke hood cleaning access door from the rear section Remove any soot that may have collected in the smoke hood C Baffles cleaning C access door A B C Replace insulation on the re...

Страница 34: ...upplied instructions for servicing and maintenance should be performed as instructed Riello 40 G120 Gas Burner ____________________________________ Carlin EZGas PRO Burner Burner 12 3 PERFORM COMBUSTI...

Страница 35: ...34 13 0 EXPLODED PARTS VIEW Exploded Parts View...

Страница 36: ...INSULATION E NUT M8 24 FRONT DOOR REFRACTORY F WASHER A8 4 25 27 29 2ND PASS RETARDERS G SETSCREW M5 x 15 26 28 3RD PASS RETARDERS H NUT M6 30 DELIVERY STUB PIPE J WASHER A6 4 31 RETURN STUB PIPE K ST...

Страница 37: ...ss Canada and the United States through a distribution network Our team of engineers designers and technicians continually research and develop products to go beyond the demanding specifications of to...