
30
11.3 Trouble shooting the control
System
Condition
Diagnostic
Condition
Check
Action
Boiler is cold,
house is cold.
Display is OFF
120 V a/c System power. Turn system power on
Display is ON
24 V a/c T-T
No 24 V; replace control
24V present; disconnect
thermostat, short T-T
Boiler starts, check wiring and thermostat.
120 V a/c at B1-B2
. If no, replace control.
. If yes, check burner and wiring.
Boiler is hot,
house is cold.
Display is ON.
120 V a/c at C1-C2
. 120 V a/c at C1-C2, check wiring to
pump. Wiring OK , is pump running ?
. If not, replace the pump.
. If pump is running, check for trapped air
or closed zone valves.
TESTING SAFETY AND CONTROL DEVICES
In the event the boiler is equipped with a low water cut off, the cut off should be
tested in accordance with the manufacturer’s recommendations. When no
instructions are available follow the guidelines in ASME CSD-1 or perform the
following procedures:
•
Set room thermostat at least 10°F above room tempe rature.
•
With Burner operating, drain boiler slowly until the burner shuts off. This shut
off should occur when the water level falls below the low water cut off probe.
•
Check to be sure the burner shut off is not due to an open limit or flame
safety issue.
•
Reset the room thermostat to the desired temperature and refill the boiler
Содержание B*G-3
Страница 26: ...25 9 2 GAS2FIRED BOILER LIGHTING INSTRUCTIONS...
Страница 28: ...27 Carlin Gas Burner 10 2 Boiler Info...
Страница 35: ...34 13 0 EXPLODED PARTS VIEW Exploded Parts View...