Setup
313888E
13
Setup
1.
Fill mixing pail with pre-mixed texture material. Mix
per material manufacturer instructions.
Add approximately 10% water to texture mix or per material manufacturer instructions. Mix thoroughly.
2.
Connect material hose to pump outlet.
Material and Sprayer Preparation
NOTE:
To minimize material pack-out in hose when
priming, completely empty hose of all water. In hot con-
ditions, it may be necessary to wet the hose with water
to lower internal hose temperature, slowing material
setup. In this case, water removal is still recommended.
If using hose lubricant/wetting solutions, refer to manu-
facturer instructions for proper priming techniques.
Cementicious and other curing materials can harden
within the drain valve while spraying. At least once per
hour stop spraying and open the drain valve to flush out
the older material.
3.
Pour mixed material into supply pail under sprayer.
4.
Place pump suction tube into mixed material.
NOTE:
For best results with aggregate, remove strainer.
Prime Pump
1.
Start gasoline engine and adjust speed to half throt-
tle. Turn prime/drain valve to DRAIN.
2.
Place material hose outlet over supply pail.
3.
Turn on/off switch ON.
Base Coat Pump:
Also turn Prime switch ON, or activate applicator
switch on material hose.
4.
Rotate pump control knob 1/4 turn. Run pump until
a steady stream of material flows from drain valve.
NOTICE
DO NOT USE MATERIALS THAT CURE RAPIDLY!
Materials with a fast curing time could plug the pump,
hose, gun, or applicator.
ti4118a
ti13638a
ti14416a
ti13652a
ti14632a
ti13640a
ti10795b
ti11930a
Содержание HTX 2030
Страница 26: ...Notes 26 313888E Notes ...
Страница 27: ...Notes 313888E 27 Notes ...