![Gorilla Playsets Pioneer Peak 1500DW Скачать руководство пользователя страница 87](http://html1.mh-extra.com/html/gorilla-playsets/pioneer-peak-1500dw/pioneer-peak-1500dw_manual_2246540087.webp)
STEP 27: MOUNT SWING BEAM ON FORT
AN EXTRA PERSON IS NEEDED FOR THIS STEP.
1: HAVE ONE PERSON WALK THE SWING BEAM OUT TO THE END OF THE FORT FROM INSIDE THE FORT WHILE THE
OTHER PERSON CARRIES IT BY THE LEGS.
2: LINE UP THE PILOT HOLE AT THE END OF THE SWING BEAM WITH THE MIDDLE HOLE ON THE SWING BEAM PLATE.
3: FASTEN THE SWING BEAM TO THE SWING BEAM PLATE AND THE SWING BEAM SUPPORT USING A 9" CARRIAGE
BOLT WITH A TORQUE WASHER AND A 3/8" LOCK NUT WITH A 3/8" WASHER ON THE BOTTOM. PLACE GREEN BOLT
CAPS OVER EXPOSED THREADS AFTER SECURING.
4: FASTEN THE SWING BEAM TO THE SWING BEAM PLATE FROM UNDERNEATH WITH A 3/8 X 3-1/2" LAG SCREW AND
3/8" WASHER.
5: IF NECESSARY USE VISE GRIPS TO HOLD CARRIAGE BOLTS IN PLACE WHEN INSTALLING.
LAG SCREW
3/8" WASHER
3/8" WASHER
3/8" NUT
3/8 X 3-1/2"
BOLT CAP
BOLT
9"
CARRIAGE
TORQUE WASHER
77
Содержание Pioneer Peak 1500DW
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 8: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 47: ...IRON DUCTILE SWING HANGERS 11 4012 TELESCOPE 07 0001 BRACKET 28 0001 6 PICTURE DESCRIPTION QTY 1 2 37...
Страница 48: ...PICTURE DESCRIPTION QTY 90 GREEN BRACKET 11 5013 SPRING CLIP 11 4003 6 9 SAFETY HANDLES PAIR 07 0005 2PR 38...
Страница 117: ...PART 2 CLATTER BRIDGE ASSEMBLY 107...
Страница 152: ...APPENDIX 142...
Страница 154: ...ASSEMBLY CHIMNEY RIGHT SIDE ASSEMBLY 1 LEFT SIDE CHIMNEY ASSEMBLY 1 CHIMNEY FRONT 1 DESCRIPTION PICTURE QTY...
Страница 155: ...CHIMNEY 2 MOUNTING 1 ASSEMBLY 1 LEFT SIDE DORMER BLOCK 5 4X3X6 3 4 CHIMNEY REAR ASSEMBLY DESCRIPTION PICTURE QTY...
Страница 156: ...DESCRIPTION PICTURE QTY 2 RIGHT SIDE DORMER 07 0031 ASSEMBLY PLASTIC DORMER SUNBURST 2...