![Gorilla Playsets Pioneer Peak 1500DW Скачать руководство пользователя страница 76](http://html1.mh-extra.com/html/gorilla-playsets/pioneer-peak-1500dw/pioneer-peak-1500dw_manual_2246540076.webp)
STEP 18C: CLIMBING RAMP
1: LOCATE FOUR 2 X 4 X 18" RAMP POST SUPPORTS.
2: PLACE A RAMP POST SUPPORT AGAINST THE RAMP POST AND THE RAMP SIDE AS SHOWN
BELOW.
3: THE BOTTOM OF THE RAMP POST SUPPORT SHOULD BE FLUSH TO THE BOTTOM OF THE RAMP
SIDE. THE TOP-END OF THE RAMP POST SUPPORT SHOULD BE FLUSH TO THE SIDE OF THE RAMP
POST.
4: ATTACH THE TOP OF THE RAMP POST SUPPORT TO THE RAMP POST WITH ONE #8 X 2-1/2"
WOOD SCREW AND ONE #8 X 3-1/2" WOOD SCREW.
5: ATTACH THE BOTTOM OF THE RAMP POST SUPPORT TO THE RAMP SIDE WITH FOUR #8 X 2-1/2"
WOOD SCREWS.
6: REPEAT SUBSTEPS 2 TO 5 FOR THE REMAINING RAMP POST SUPPORTS.
RAMP POST
RAMP SIDE
RAMP POST
SUPPORT
SUPPORT
RAMP POST
SUPPORT
RAMP POST
SUPPORT
RAMP POST
RAMP POST
A
#8 X 2-1/2"
WOOD SCREW
#8 X 2-1/2"
WOOD SCREW
RAMP POST
SCALE 2 : 13
DETAIL A
SUPPORT
RAMP POST
WOOD SCREW
2 x 4 x 18"
#8 X 3-1/2"
RAMP SIDE
66
Содержание Pioneer Peak 1500DW
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 8: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 47: ...IRON DUCTILE SWING HANGERS 11 4012 TELESCOPE 07 0001 BRACKET 28 0001 6 PICTURE DESCRIPTION QTY 1 2 37...
Страница 48: ...PICTURE DESCRIPTION QTY 90 GREEN BRACKET 11 5013 SPRING CLIP 11 4003 6 9 SAFETY HANDLES PAIR 07 0005 2PR 38...
Страница 117: ...PART 2 CLATTER BRIDGE ASSEMBLY 107...
Страница 152: ...APPENDIX 142...
Страница 154: ...ASSEMBLY CHIMNEY RIGHT SIDE ASSEMBLY 1 LEFT SIDE CHIMNEY ASSEMBLY 1 CHIMNEY FRONT 1 DESCRIPTION PICTURE QTY...
Страница 155: ...CHIMNEY 2 MOUNTING 1 ASSEMBLY 1 LEFT SIDE DORMER BLOCK 5 4X3X6 3 4 CHIMNEY REAR ASSEMBLY DESCRIPTION PICTURE QTY...
Страница 156: ...DESCRIPTION PICTURE QTY 2 RIGHT SIDE DORMER 07 0031 ASSEMBLY PLASTIC DORMER SUNBURST 2...