Important:
Wet cutting is to be accomplished while working! This prevents the
appearance of particulate matter and increases the life-time of the diamond tool!
Control the working area for water-, gas- and electrical lines!
During work
Make sure, that the machine is well fastened before and while cutting!
Never touch rotating parts like blade shaft or blade!
After work
Before leaving the machine always secure it against unauthorized use!
3.6 Special work related to the maintenance and repair of the machine
Observe the adjustment, maintenance and inspection activities and intervals set out in the operating
instructions, including information on the replacement of parts and equipment! These activities may be
executed by skilled personnel only.
Brief operating personnel before beginning special operations or maintenance work, and appoint a
person to supervise the activities.
In any work concerning the operation, conversion or adjustment of the machine and it’s safety-oriented
devices or any work related to maintenance, inspection and repair, always observe the start-up and
shut-down procedures described in the operating instructions and the information on maintenance
work. Ensure that the maintenance area is adequately secured.
Carry out maintenance and repair work only of the machine is positioned on stable and level ground
and has been secured against inadvertent movement and buckling. If the machine is completely shut
down for maintenance and repair work, it must be secured against inadvertent starting.
To avoid the risk of accidents, individual parts and large assemblies being moved for replacement
purposes should be carefully attached to lifting tackle and secured. Use only suitable and technically
perfect lifting gear and suspension systems with adequate lifting capacity. Never work or stand under
suspended loads.
The fastening of loads and the instructing of crane operators should be entrusted to experienced
persons only. The marshaller giving the instructions must be within sight or sound of the operator.
For carrying out overhead assembly work always use specially designed or otherwise safety-oriented
ladders and working platforms. Never use machine parts as a climbing aid. Wear safety harness when
carrying out maintenance work at greater heights.
Clean the machine, especially connections and threaded unions, of any traces of oil, fuel or
preservatives before carrying out maintenance / repair. Never use aggressive detergents. Use lint-free
cleaning rags.
Before cleaning the machine with water, steam jet or detergents, cover or tape up all openings which -
for safety and functional reasons - must be protected against water, steam or detergent penetration.
Do not clean the machine with a high-pressure cleaner. The hard water jet can put damage to parts of
the machine. After cleaning, remove all covers and tapes applied for that purpose.
After cleaning check the machine for loose connections, chafe marks and damage! Have identified
defects repaired immediately!
Always tighten any screwed connections that have been loosened during maintenance and repair.
Any safety devices removed for set-up, maintenance or repair purposes must be refitted and checked
immediately upon completion of the maintenance and repair work. Ensure that all consumables and
replaced parts are disposed of safely and with minimum environmental impact.
Содержание TS 200
Страница 2: ...TS200 TS250 Translation of the original operating instruction and spare parts list 2 5007090 00 BA E...
Страница 36: ...TS200 TS250 Translation of the original operating instruction and spare parts list 36 5007090 00 BA E 9 2 Frame...
Страница 40: ...TS200 TS250 Translation of the original operating instruction and spare parts list 40 5007090 00 BA E...