Tap hole drilling for wall duct
Create a hole with a diameter of 200 mm.
Feed the fan connecting lead (min. 3 x 0.25 mm2) into the wall duct.
The fan connecting lead must be perpendicular to the axe of the wall duct.
6.2
Installation of wall ducts
Determine the overall thickness of the wall structure from
the dimensions of:
- The work measurement (D)
- The outside (E) (e.g. heat insu plaster)
- The inside (X) (e.g. p tiles).
- The minimal length might never be shorter then 240 mm
Slide the wall duct into the wall opening, observing the
gradient to the outside / the room-side marking of the wall
duct. Allow the wall duct to stand perpendicular on the
both room and façade sides in accordance with the above
calculation.
Attention:
To ensure good movement of the fan / heat unit in the
wall duct, deformations of the wall duct due to external
pressure/tension should be avoided!
Содержание Fox-Up
Страница 26: ...R 24 Maintenance work carriedoutby 8 MAINTENANCEREPORT FILTERCLEANING Maintenancereport...
Страница 28: ...R 26...
Страница 52: ...R 50 Wartungsarbeiten ausgef hrtdurch 8 WARTUNGSPROTOKOLL FILTERREINIGUNG Wartungsprotokoll...
Страница 54: ...R 52...
Страница 78: ...R 76 Onderhoudswerk uitgevoerddoor 8 ONDERHOUDSVERSLAG FILTERREINIGING Onderhoudsverslag...
Страница 80: ...R 78...
Страница 104: ...R 102 Travaux de maintenance Effectu spar 8 ONDERHOUDSVERSLAG FILTERREINIGING Rapportdemaintenance...
Страница 106: ...R 104...
Страница 107: ...R www glt de www ventilairgroup com...