13
EN
10.
START-UP REPORT
Building project:
Client:
Street:
Postcode / place:
Telephone:
E-Mail:
Ventilation unit(s) installed:
Type:
Number:
:
Fitter:
:
Installer:
Company:
Street:
Postcode / place:
Telephone:
E-Mail:
• Installation work completed
• Electrical connection carried out / tested in a technically correct manner
• Unit function checked
• Filter insert(s) used
• Unit operator instructed (operation, maintenance)
• Unit documentation handed over (installation / operating instructions)
Option when operating units in conjunction with heat-producing appliances:
• Safety devices installed / tested
Place:
Date:
Fitter:
Client:
Содержание Fox-Up
Страница 26: ...R 24 Maintenance work carriedoutby 8 MAINTENANCEREPORT FILTERCLEANING Maintenancereport...
Страница 28: ...R 26...
Страница 52: ...R 50 Wartungsarbeiten ausgef hrtdurch 8 WARTUNGSPROTOKOLL FILTERREINIGUNG Wartungsprotokoll...
Страница 54: ...R 52...
Страница 78: ...R 76 Onderhoudswerk uitgevoerddoor 8 ONDERHOUDSVERSLAG FILTERREINIGING Onderhoudsverslag...
Страница 80: ...R 78...
Страница 104: ...R 102 Travaux de maintenance Effectu spar 8 ONDERHOUDSVERSLAG FILTERREINIGING Rapportdemaintenance...
Страница 106: ...R 104...
Страница 107: ...R www glt de www ventilairgroup com...