Gill Instruments Ltd
_____________________________________________________________________________________________________________
________________________________________________________________________________________________
MetPak/MetPak RG and MetPak Pro Base Stations
Page | 46
Issue 1
Doc. No. 1723-PS-0023
October 2018
Junction Box (1723-PK-021) Panel or Wall Mount
Using Gill Instruments part 1723-PK-204 Pack of 4 feet for Wall or Panel Mounting the Junction
Box.
5.6.
Solar Installation
If a Solar Sensor is used with a MetPak Pro Base Station it should be mounted horizontally and as
level as possible.
A clear view of the sky is best for an optimal solar measurements. Mounting obstructions, tree
canopy, hills, mountains and tall buildings that obscure the view overhead or of the horizon can
impede solar readings.
If a solar sensor is incorporated with the Base Station then mount the unit as vertical as possible
during installation for optimal readings.
5.7.
Rain Gauge Installation
If an ARG100 rain gauge tipping bucket mechanism is used a MetPak RG or Pro Base Station
then it comes with a 6 metre lead and is immobilised before shipping to prevent damage in transit.
To release the mechanism, remove the funnel from its base by unscrewing the three nylon
thumbscrews.
Remove the piece of foam from under the bucket mechanism. This foam may be saved and used
whenever the rain gauge is moved.
Panel/Wall Mounting
foot