FINAL CHECK OUT AND TEST
• E90
→
0000
NUMBER OF CYCLES
• E92
→
1234
INSTALLER CODE
• E94
→
XX_YY FIRMWARE RELEASE
• E96
→
0000
NUMBER OF CYCLES DONE
• E98
→
0000g NUMBER OF OPERATION DAYS
Before giving power to the equipment, the following check outs are required:
1 - Check the electrical connections: a wrong connection may damage both the equipment and the installer.
2 - Check the correct position of the limit switches.
3 - Preset the mechanical stops in opening and closing.
4 - Power the equipment.
5 - Check that the red LEDs of the usually closed contacts are on and the green LEDs of the usually open
contacts are off.
6 - Check that on the lcd do not appear any mismatch between enabling and input status
7 - Check that the relative LEDs turn off when limit switches work.
8 - Check that the relative LED turns off when the photocells ray is intercepted.
9 - Check that the motors are blocked and ready to work with GATE AT HALFWAY POSITION.
10 - Remove possible obstacles in the operating area of the gate, then give the command START. At the first
command, the equipment starts opening, then check that the motion direction is correct, otherwise power
the control unit down, invert the wires in the motors clamps, power the control unit up again and give a new
START command.
11 - The gate will stop upon the first limit switch. It is necessary a complete movement to activate the regular
working of the decelerations.
Gi.Bi.Di advises recycling the plastic components and to dispose of them at special
authorised centres for electronic components thus protecting the environment from
polluting substances.