Operating instructions SG 160
8 Fusion
35
After the cooling time (cooling time = heating time) loose the fixing lever and
remove the piece.
The fusion set temperature should be checked periodically on the fusion
tools with tempil sticks or an appropriate, fast responding, temperature
measurement device.
It is prohibited to use any coolant!
The joint may only be stressed by further installing after the cooling
period has expired.
All fusion joints must have cooled completely before the pressure test is
performed. This is usually the case after a waiting period of approx. one
hour after the last jointing.
Attention
Attention
Attention
Attention
Содержание SG 160
Страница 56: ...11 Customer service Operating instructions SG 160 52...
Страница 57: ...Operating instructions SG 160 11 Customer service 53...
Страница 58: ......
Страница 59: ......