6 Design and Mode of Operation
Operating instructions SG 160
12
6.1
Installation
The installation of the SG 160 should be done according to specifications in
order to ensure safe and optimal operation.
The transport crate is designed as a work bench.
The machine can be lifted out when the clamps are released. When the lid is
closed, please see that the machine is placed in the provided mounting slots.
Check the voltage!
The generator has to be started before connecting the consumers and must
supply a constant output voltage!
CAUTION
Содержание SG 160
Страница 56: ...11 Customer service Operating instructions SG 160 52...
Страница 57: ...Operating instructions SG 160 11 Customer service 53...
Страница 58: ......
Страница 59: ......