13 Menu structure and work sequence
Instruction Manual BCF Plus
(11.15) BCF Plus_BA_04
26
13.7
Clamping the pipes / fittings and positioning
the bladder d 75 – 110 mm
1. Cleaning of the bladder.
Wait until the cleaning fluid has
evaporated completely.
Only then may the bladder be inserted
halfway in the second pipe/fitting end.
2. Confirm with
ENTER button
without closing
the
clamping unit
.
3. Insert bladder halfway into the
second pipe or fitting end by pulling
air hose backwards.
Notice the marking!
4. Confirm with
ENTER button.
Pressure is not completely blown up.
5. With the
UP-
DWN button
inflate or deflate the bladder until
the bladder is holding in the pipe
and half of the bladder outside.
NOTE
NOTE