3.2. Unpacking
Carefully unpack the UPS, then carefully locate the UPS onto the site which has
selected, with all the points in section 3.1 kept in mind.
The UPS has had detailed production and QC testing of all the electrical and
mechanical characteristics prior to shipment from the factory. Therefore, the UPS
should be in proper condition upon receipt. Once received, the UPS should be first
checked visually to determine if any physical damage has occurred during
transportation.
Then check to insure that all the accessories/options (match with your purchase order)
have been included.
- DOOR KEY
- THIS INSTRUCTION MANUAL
- BATTERY FUSE (FOR BATTERY CABINET ONLY)
- SPARE SCREWS FOR COVER PLATE
- SPARE SCREWS FOR CONNECTION TERMINALS etc.
Lastly, check to insure that the specification of the UPS is identical to the
specification of your order. The key items in the specification you must check are:
- RATED POWER OF THE UPS,
- INPUT VOLTAGE & FREQUENCY
- OUTPUT VOLTAGE & FREQUENCY
- NO. OF OUTPUT PHASES (1
Φ
OR 3
Φ
)
- BATTERY VOLTAGE OR CELL NO.
Also check to insure that the necessary documentation is attached:
- GUARANTEE CARD
- AGENT/SERVICE CENTER INFORMATION
3-5
Содержание T3UPS-33-700K
Страница 18: ...1 7 Dimension Drawings 10KVA 60KVA OUTLINE DRAWING 1 13 ...
Страница 19: ...10KVA 60KVA INTERIOR DRAWING 1 14 ...
Страница 20: ...75KVA 160KVA OUTLINE DRAWING 1 15 ...
Страница 21: ...75KVA 160KVA INTERIOR DRAWING 1 16 ...
Страница 22: ...175KVA 320KVA OUTLINE DRAWING 1 17 ...
Страница 23: ...175KVA 320KVA INTERIOR DRAWING 1 18 ...
Страница 24: ...INTER PCB DIAGRAM 1 19 ...
Страница 31: ...1 ...
Страница 35: ...3 3 ...
Страница 70: ...ONE TO TWO SERIAL REDUNDANCY 8 3 ...
Страница 77: ...Appendices Additional Data on Options UPSCOMTM UPSCALLTM DCMANTM ...
Страница 80: ...3 ...
Страница 81: ......