Transport and Lifting Instructions
62 ZX-135/70
Part No. 160567
Observe and Obey:
Only qualified riggers should rig the machine.
Only certified crane operators should lift the
machine and only in accordance with the
applicable crane regulations.
Be sure the crane capacity, loading surfaces
and straps or lines are sufficient to withstand
the machine weight. See the serial label for the
machine weight.
Lifting Instructions
Fully lower and retract the boom. Fully lower the jib.
Remove all loose items on the machine.
Determine the center of gravity of your machine
using the table and the picture on this page.
Attach the rigging only to the designated lifting
points on the machine. There are four lifting points
on the machine, one on each axle.
Adjust the rigging to prevent damage to the
machine and to keep the machine level.
Center of gravity
X Axis
Y Axis
ZX-1
3
5/70
72.75 in
1.85 m
40.5 in
1.03 m
Содержание X-135/70
Страница 9: ...First Edition Seventh Printing Operator s Manual General Safety Part No 160567 ZX 135 70 7 ...
Страница 11: ...First Edition Seventh Printing Operator s Manual General Safety Part No 160567 ZX 135 70 9 ...
Страница 12: ...Operator s Manual First Edition Seventh Printing General Safety 10 ZX 135 70 Part No 160567 ...
Страница 13: ...First Edition Seventh Printing Operator s Manual General Safety Part No 160567 ZX 135 70 11 ...