Rev. 01 12/21
MagicControl 4.0 (CM40)
Operation
•
37
fig. 22: Coating programs
Confirm program selection
Copy programs
Paste programs
Exit screen
Scroll bar
Delete entry in search field
Data search by alphanumeric entry
Data search by program number entry:
– The topmost entry is set to the number searched for
Currently selected line
Currently loaded object that is available for editing
3.
Select coating program and confirm selection
The plant control is now ready for production
.
Plants with program change per station (internal
or external)
For plants with internal or external program change, proceed as follows:
1.
For external program changes, the number in the middle must be
checked according to the plant specific solution
Содержание CM40
Страница 28: ...Rev 01 12 21 28 Product description MagicControl 4 0 CM40 ...
Страница 64: ...Rev 01 12 21 64 Operation MagicControl 4 0 CM40 ...
Страница 82: ...Rev 01 12 21 82 Maintenance Repairs MagicControl 4 0 CM40 ...
Страница 92: ...Rev 01 12 21 92 Diagnostic MagicControl 4 0 CM40 ...
Страница 120: ...Rev 01 ...