![Geax XD5 Скачать руководство пользователя страница 6](http://html2.mh-extra.com/html/geax/xd5/xd5_operation-and-safety-manual_3999277006.webp)
GEAX
s.r.l.
Chapter 2
TRANPORTING THE DRILLING RIG
1
Chapter 2
TRANSPORTING THE DRILLING RIG
2.1 Before/after transporting the drilling rig
2.1.1 Removing the tool
If the rig is standing on farmland, proceed as follows:
•
Lower the tool to the ground and make a small drilling rotation to ensure
that the tool remains stable once it is detached from the kelly bar.
•
Remove the safety catch and pull out the pin.
•
Raise the kelly bar.
•
Move the tool away.
If the rig is standing on a paved surface, proceed as follows:
•
Prepare and place on the surface some wood thicknesses;
•
Place the tool on the blocks of wood so that the support is stable;
•
Remove the safety catch and pull out the pin.
•
Raise the kelly bar.
•
Move the tool away.