![Geax XD5 Скачать руководство пользователя страница 49](http://html2.mh-extra.com/html/geax/xd5/xd5_operation-and-safety-manual_3999277049.webp)
GEAX
s.r.l
Chapter 7
CONTROLLING GENERAL HAZARDS
5
7.5 Additional equipment
7.5.1
Jobsite arrangement
All the equipment required for work must be arranged in an orderly manner, if
possible in a single place and outside the area occupied by the rig when in
operation. The reason for this is that a ground operator who is busy preparing
equipment cannot pay attention to the rig and all its moving parts.
7.5.2
Drilling rig arrangement
Do not under any circumstances place equipment of any kind on the drilling
rig, either on the sides (leaning) or on horizontal surfaces.