Chapter 2
TRANPORTING THE DRILLING RIG
8
2.2 Loading, unloading and anchoring the rig on a truck / semitrailer
2.2.1
Positioning the truck / semitrailer
The trailer must be placed on level ground, firm enough to allow
using the loading ramps and performing the manoeuvres required to
align the rig to the ramps. The climb must be straight and in line with
the trailer
(see fig.2.2.2.1)
.
Make sure there are no obstacles or overhead cables inside the drilling rig’s
manoeuvring space
(see fig. 2.3.1.1)
.
2.2.2
Loading and unloading
When loading or unloading the rig on/from the trailer, the r
ig’s
configuration must be as showed in
fig. 2.2.2.2
, i.e., with the tool
detached and the undercarriage extended.
Considering that the drilling machine is definitely closer than the truck, the
ramps must be carefully positioned at the right distance
fig.2.2.2.1 .
fig.2.2.2.1
The
fig.2.2.2.2-3-4
show loading operation.
fig.2.2.2.2